Battery Cycler
Battery test equipment for packs and modules. 4 systems according to our evaluation matrix, 29 characteristics per system from public manufacturer documents.
Open comparisonComparison portal for e-mobility test systems
Which e-mobility test system fits your device under test and what you plan to do? Here you can put devices side by side, see at a glance which information is backed by evidence and which is not, and use it to prepare your request for quotation.
Information with sources · gaps stay visible · your requirements count
Comparisons
All comparisons follow the same structure: selection, table, open points, questions and RFQ.
E-mobility / Battery Cycler
Battery test equipment for packs and modules. 4 systems according to our evaluation matrix, 29 characteristics per system from public manufacturer documents.
Open comparisonE-mobility / Battery Emulator
Battery emulators for inverters, e-axles and on-board chargers. Preliminary edition with 4 systems and 29 characteristics per system.
Open comparisonEVSE / AC charging points
Functional and safety testing at AC charging points. Four device configurations, 37 AC-relevant criteria, with source and location for each entry.
Open comparisonEVSE / DC and AC/DC charging points
DC charging station testers (DC EVSE testers) for CCS2 fast-charging points and combined AC/DC systems: function, charging communication and safety. Three device configurations with 58 criteria, with source and location for each entry.
Open comparisonYou choose the candidates, have the differences highlighted and take the comparison with you as a PDF.
Go to comparisonWhere something is missing or unclear, you note a question directly at the characteristic. You add locations or counter-statements, and everything together goes into the contact form.
Contact and correctionsYou describe your project, specify what is mandatory and what is desired, and get the request for quotation as a PDF – ready for the manufacturer.
Define requirementsComparison overview
Each comparison covers one topic – one device type, one test case. You see the technical characteristics, the evidence for them and, honestly, what is still open.
E-mobility / Battery Cycler
Battery test equipment for traction batteries – packs and modules – in development, validation and type testing. The device under test is the battery itself: capacity, internal resistance, driving and charging profiles, aging.
Open comparison“Not publicly documented” counts as No. Corrections with a public source are possible at any time.
E-mobility / Battery Emulator
Battery emulators replace the traction battery when testing inverters, e-axles, DC/DC converters and on-board chargers. The device under test is the HV component, not the battery.
Open comparisonPreliminary edition: no system reaches the regular minimum score yet.
EVSE / AC charging points
On-site testers for functional and electrical safety tests at AC charging points (Type 2 / Type 1). The information comes from public manufacturer documents (as of November 21, 2026) and is evaluated according to BEST-Matrix v0.109.
Open comparisonEvery entry with source and location; “not publicly documented” counts as No.
EVSE / DC and AC/DC charging points
On-site testers for DC fast-charging points (CCS2, CHAdeMO, NACS) and combined AC/DC testing. The information comes from public manufacturer documents (as of November 21, 2026) and is evaluated according to BEST-Matrix v0.109.
Open comparisonEvery entry with source and location; “not publicly documented” counts as No.
We are expanding the portal step by step with further topics and criteria. The Battery Emulator appears as a preliminary edition; the EVSE information is based on public manufacturer documents and is under review. Both are deliberately labeled as such.
How we compareModel overviews: Battery Cycler · Battery Emulator · EVSE AC · EVSE DC and AC/DC
E-mobility / Battery Cycler (battery test equipment)
Battery test equipment for traction batteries – packs and modules – in development, validation and type testing. Four systems meet our admission rules. All information comes from public manufacturer documents; anything not documented there counts as No. A selection, yes; a ranking, no.
Public manufacturer informationApplication: Performance and service-life testing of traction batteries (packs and modules): capacity, internal resistance and pulse power, driving and fast-charging profiles, aging tests. The device under test is the battery itself. View admission rules, criteria and sources.
Up to four systems. The table and downloads only show selected matches in the current filter.
4 / 4 matches
In the table: Arbin RBT-Pack (RBT45012) (Battery Cycler) · Chroma 17040E-1700V (Battery Cycler) · EA-BT 20000 (Battery Cycler) · Keysight Scienlab SL1740A (Battery Cycler)
This selection contains different test objects. Technical ranges apply to the respective use case.
Focus highlights one column.
Contains your selected systems including highlights, portal origin and data version. On your first download we ask once for your name for the “Created for” line; every download is reported to us with name, company and file.
Scrolling vertically moves the page, horizontally the table; the criterion stays visible on the left. Exports use the visible selection.
| Comparison criterionEntry per system; evidence and review status in the cell | Arbin RBT-Pack (RBT45012) Arbin InstrumentsManufacturer information · unverified | Chroma 17040E-1700V Chroma ATEManufacturer information · unverified | EA-BT 20000 EA Elektro-AutomatikManufacturer information · unverified | Keysight Scienlab SL1740A Keysight TechnologiesManufacturer information · unverified |
|---|---|---|---|---|
Performance dataBestEVTestSystems.com | ||||
| BC01Max. voltage in V | Value 1000 V | Value 1700 V | Value 1500 V | Value 1500 V |
| BC02Min. voltage at full current (module testing) in V | Not stated Not publicly documented · as of Nov 20, 2026 · not stated | Not stated Not publicly documented · as of Nov 20, 2026 · not stated | Value 3.5 V (U_min for I_max in sink mode, BT 21500-60) | Not stated Not publicly documented · as of Nov 20, 2026 · not stated |
| BC03Max. current per output in A | Value 600 A (6 × 100 A in parallel, calculated) | Value 400 A | Value 3840 A (system, calculated 64 × 60 A) | Value 900 A |
| BC04Max. power per output in kW | Value 360 kW (chassis) | Value 200 kW | Value 1920 kW (system) | Value 300 kW |
| BC05Outputs per system / parallel connection | Value up to 6 channels per chassis, series/parallel; up to 4 chassis | Value 1 channel per cabinet; parallel fixtures: system up to 2400 A / 1.6 MW (1700 V model) Available as an option | Value Master-auxiliary bus up to 64 units / 8 cabinets; share bus | Value 1 output; parallel operation up to 6 systems (e.g. 1.62 MW / 3600 A) |
DynamicsBestEVTestSystems.com | ||||
| BC06Current rise time 10–90 % in ms | Value ≤ 2 ms | Value 1 ms | Value ≤ 2 ms | Value < 1 ms |
| BC07Switching time charge ↔ discharge in ms | Value 0 ms (bipolar, 'zero switching time') | Value 2 ms | Not stated Not publicly documented · as of Nov 20, 2026 · not stated | Value 0 ms (no switching time when changing between positive and negative current; −90 → +90 % in < 1 ms) |
| BC08Smallest profile step size in ms | Value 10 ms (drive cycle setpoints); minimum step time 5 ms | Not stated Not publicly documented · as of Nov 20, 2026 · not stated | Value 200 ms (recommended minimum, sequencing in EA Power Control) | Not stated Not publicly documented · as of Nov 20, 2026 · not stated |
Measurement and voltage qualityBestEVTestSystems.com | ||||
| BC09Voltage measurement accuracy in %, reference | Value ±0.02 % of FS – type unclear (measurement or setting not stated) | Value ±(0.02 % of rdg + 0.02 % of range) – measurement, total error at full scale 0.04 % | Value ±0.05 % of FS – measurement, total error at full scale 0.05 % | Value ±(0.03 % of rdg + 150 mV) – measurement, total error at full scale 0.04 % |
| BC10Current measurement accuracy in %, reference | Value ±0.02 % of FS – type unclear (measurement or setting not stated) | Value ±0.05 % of range – measurement, total error at full scale 0.05 % | Value ±0.1 % of FS – measurement, total error at full scale 0.1 % | Value ±(0.03 % of rdg + 150 mA) – measurement, total error at full scale 0.047 % |
| BC11Current measurement ranges number | Value 2 | Value 4 | Not stated Not publicly documented · as of Nov 20, 2026 · not stated | Value 3 (option) |
| BC12Recording rate in ms | Value 1 ms (up to 1 kHz), bursts 0.1 ms (10 kHz) | Value 1 ms (waveform mode), 10 ms (CC/CV/CP) | Value 100 ms (logging in EA Power Control); USB logging on the device from 500 ms; actual values retrievable at 1 ms intervals via EtherCAT | Value 1 ms |
Test sequences / battery modelBestEVTestSystems.com | ||||
| BC13Test plan editor with profile import | Yes | Yes | Partial Sequences from CSV files (App SeqLog, steps from 100 ms) and the “Battery test” function in EA Power Control | Yes Test programs with subroutines, variables and parallel sequences; drive profiles can be imported as .csv or .txt files (ESD) |
| BC14Templates for HPPC/DCIR and capacity | Yes | Yes | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No |
| BC15Templates for standard tests (e.g. ISO 12405-4) | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes ISO 12405, GB/T 31467, GB/T 31484, IEC 61960 | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No |
| BC16Restart after power failure without data loss | Yes, as option UPS option: detect power failure, safely pause/resume the test | Yes yes (data recovery after power failure) | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No |
| BC17Impedance spectroscopy (EIS) | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No |
IntegrationBestEVTestSystems.com | ||||
| BC18BMS communication CAN FD with residual bus simulation | Yes CAN 2.0 / CAN FD with freely configurable messages to emulate BMS/vehicle network traffic | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No | No Not publicly documented · as of Nov 20, 2026 · counts as No |
| BC19Climate chamber / coolant control | Yes | Yes Chamber control as an operating mode (“Chamber control”); thermostat and chiller integration via BatteryPro; integrated temperature chamber as a customization | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes |
| BC20Auxiliary channels for cell voltage/temperature | Yes | Yes, as option optional data logger for cell voltages/temperatures | Partial 3 inputs for temperature sensors (Digital In/Out); auxiliary channels for cell voltages not documented | Yes, as option SL106XX Measurement and Control Modules |
| BC21Automation interface | Yes ArbinCTI (TCP/IP), Lua, ArbinClient (Python/C#/Web Services), DLL; LIMS/MES | Yes Ethernet (SCPI, LabVIEW/LabWindows), CAN commands, analog I/O for HIL, Modbus/RS-485 | Yes EtherCAT (≤ 1 ms), Modbus, SCPI, LabVIEW, IVI, CAN FD | Yes Optional standardized remote interface; ESD controllable via WCF/REST/XML |
SafetyBestEVTestSystems.com | ||||
| BC22Hardware limit shutdown | Yes | Yes | Yes | Yes |
| BC23Insulation monitoring | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes, as option Bender iso685 (Option L11-005780) | Yes, as option Insulation monitor (rack option) | Yes, as option Bender iso685 (Option T01) |
| BC24Integration into the test cell safety chain | Yes | Yes, as option Isolated digital I/O card with safety input for external devices and safety output; according to the datasheet additional and for special applications on request | Yes | Yes |
| BC25Device safety standard | Yes UL 62368-1 / CSA C22.2 No. 62368-1 (power modules), CE | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes EN/IEC/UL 61010-1, CSA C22.2 No 61010-1; EMC EN 61326-1 | No Not publicly documented · as of Nov 20, 2026 · counts as No |
Operation and serviceBestEVTestSystems.com | ||||
| BC26Regeneration efficiency in % | Value up to 92 % | Value > 92 % (most conservative value; the datasheet also states > 93 % at > 50 % rated power) | Value up to 96.8 % (BT 21500-60, source/sink) | Value up to 96 % |
| BC27Cooling (air/water) | Value Air | Value Air | Value Air (fans front→rear), water cooling optional | Value Water/air heat exchanger (cooling water 7–19 °C), max. 1 kW waste heat into the room |
| BC28Service and calibration in DACH | Yes Arbin Europe, Munich (sales and support office) | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes Manufacturer in Viersen (Germany) | Yes Keysight Germany: service and test center Böblingen, Bochum site (automotive/R&D); KeysightCare, recalibration recommended every 12 months |
ClassificationBestEVTestSystems.com | ||||
| BC29Also admitted as battery emulator | No Not publicly documented · as of Nov 20, 2026 · counts as No | Yes Chroma 17040E – admission criteria met | No EA PSB 10000 / EABS – admission not substantiated | No Keysight SL1800A – admission criteria not met |
Totals, configuration and sourcesBestEVTestSystems.com | ||||
| ΣTotal per status | Yes: 10 · Yes, as option: 1 · No: 4 · Value: 13 · Not stated: 1 · Total: 29 Yes and Yes, as option combined: 11 · not a rating | Yes: 8 · Yes, as option: 3 · No: 4 · Value: 12 · Not stated: 2 · Total: 29 Yes and Yes, as option combined: 11 · not a rating | Yes: 5 · Yes, as option: 1 · Partial: 2 · No: 7 · Value: 12 · Not stated: 2 · Total: 29 Yes and Yes, as option combined: 6 · not a rating | Yes: 6 · Yes, as option: 2 · No: 7 · Value: 12 · Not stated: 2 · Total: 29 Yes and Yes, as option combined: 8 · not a rating |
| B01Reference configuration | One chassis RBT45012: 40–1000 V, 6 channels of ±100 A in parallel → 600 A (calculated), chassis power up to 360 kW. Alternative RBT46012: 60–1500 V, 2 × ±150 A → 300 A, 360 kW (K1 = 2). | One cabinet 17040E-1700V (200 kW, 1 channel), 1700 V range (30–1700 V) with max. 400 A. Without parallel fixtures (system information on this is contradictory). | Largest system according to the datasheet: 64 × EA-BT 21500-60 (each 0–1500 V, ±60 A, 30 kW) on the master-auxiliary bus, 8 cabinets of 42 U → 1500 V, 3840 A (calculated 64 × 60 A), 1920 kW. A single 42U cabinet: 8 units → 1500 V / 480 A / 240 kW. | 1 cabinet SL1740A with voltage option 50–1500 V and current option 900 A, 3 power levels, 300 kW standard power (Dynamic Power Boost 350 kW time-limited, not counted). Without parallel operation. |
| B02Admission according to BEST-Matrix v0.109 | Admission criteria met | Admission criteria met | Admission criteria met | Admission criteria met |
| B03Sources and evidence | 8 manufacturer sources assigned | 7 manufacturer sources assigned | 11 manufacturer sources assigned | 10 manufacturer sources assigned |
| BestEVTestSystems.comData as of: Nov 20, 2026 · comparison version 0.109 · public manufacturer information, BEST-Matrix v0.1094 systems · selected matches · full view · all criteria visible | ||||
Class: Battery Cycler (pack and module). Information as of: November 20, 2026. Public manufacturer documents, evaluated according to BEST-Matrix v0.109; the numbers only count what is in the table.
Grand total: Yes: 29 · Yes, as option: 7 · No: 24 · Value: 47 · Not documented: 9 · 116 technical entries.
29 technical characteristics per visible system. Numerical values and descriptions count as “Value”; “Not documented” counts as No for status characteristics and as “Not documented” for value characteristics. Configuration, admission and sources are shown separately.
From preselection to query
The numbers overlap: an entry can be missing and unsupported at the same time. A document only counts as evidence once we have checked it. This is not an assessment of quality or suitability.
Under “My questions” you review the templates and decide where the request goes. We forward questions to manufacturers manually.
“Add question” does not change any entry in the table – you only note a query. The symbols still show what the manufacturer declares.
“Add question” collects a query about the characteristic; it appears under “My questions”. There you choose the route: clarification by the portal or a request to the manufacturer. Both lead to the contact form; nothing is sent while collecting.
Want to clarify open entries in a targeted way? Our guide with procurement checklist shows which questions are worth asking.
Application & data basis
The basis is our evaluation matrix BEST-Matrix v0.109: admission rules, nine weighted criteria with fixed thresholds and a minimum score. The points only decide on admission; in the comparison the systems are listed alphabetically and without ranking.
Device under test: The battery itself: traction battery pack or module.
Application: Performance and service-life testing of traction batteries (packs and modules) in development, validation and type testing: capacity and energy content, internal resistance and pulse power (HPPC/DCIR), driving and fast-charging profiles, cycle and calendar aging with check-ups, tests according to ISO 12405-4 and to vehicle manufacturers' specifications – with BMS communication and climate chamber.
| Rule | Requirement |
|---|---|
| C-Z1 · Intended purpose | Offered as a battery test system, with its own test software for programmed test sequences and data recording. Whether the documents explicitly mention Ah and Wh is not an admission condition (interpretation of October 8, 2026, applied equally to all systems). |
| C-Z2 · Bidirectional with energy recovery | Charging and discharging in the same system; discharge energy is fed back into the grid or a DC link. |
| C-Z3 · HV pack power class | At least 1000 V, 300 A and 100 kW (rated values) in one configuration. |
| C-Z4 · Current and documented | Available product with a public datasheet or product page with rated values. |
We reviewed these systems against the same rules using the public documents. If the manufacturers publish missing information, we review again at the next cut-off date.
| System | Reason |
|---|---|
| BaSyTec RPS-HR | Admission criteria met, minimum score of the evaluation matrix not reached. Correction with a public source possible at any time. |
| Regatron G5.BT | Admission criteria met, minimum score of the evaluation matrix not reached. Correction with a public source possible at any time. |
| NHR 9300 | Admission criteria met, minimum score of the evaluation matrix not reached. Correction with a public source possible at any time. |
| Bitrode FTF-HV | Admission criteria met, minimum score of the evaluation matrix not reached. Correction with a public source possible at any time. |
| AVL E-STORAGE SiC | Admission criteria met, minimum score of the evaluation matrix not reached. Correction with a public source possible at any time. |
| HORIBA Battery Cycler | Admission not substantiated: at least one admission item is missing from the public manufacturer documents. Correction with a public source possible at any time. |
| Digatron EVT 1500 | Admission not substantiated: at least one admission item is missing from the public manufacturer documents. Correction with a public source possible at any time. |
| NEWARE CE-6000 | Admission not substantiated: at least one admission item is missing from the public manufacturer documents. Correction with a public source possible at any time. |
| Gustav Klein I-TS | One admission rule is demonstrably not met. |
| Cinergia B2C+ | One admission rule is demonstrably not met. |
| ITECH IT6000C | One admission rule is demonstrably not met. |
Device under test: A device that is otherwise connected to the traction battery: traction inverter and e-axle on the test bench, DC/DC converter, on-board charger, HV auxiliaries such as e-compressor or heater.
Application: Reproducible and safe emulation of the electrical behavior of a traction battery in the development and validation of HV components and powertrains: test bench runs without a real battery, any state of charge and state of health at the push of a button, limit and fault cases (undervoltage and overvoltage, voltage dips, superimposed ripple according to ISO 21498-2 or LV 123) and coupling to HIL and test bench automation.
| Rule | Requirement |
|---|---|
| E-Z1 · Battery model | A battery model that is active during operation – at least open-circuit voltage depending on the state of charge, and internal resistance – in the device or in the associated software. A pure voltage setpoint is not sufficient. |
| E-Z2 · Bidirectional with energy recovery | Supplies and absorbs power (motor and generator operation of the device under test); energy recovery into the grid or a DC link. |
| E-Z3 · HV vehicle electrical system power class | At least 1000 V, 300 A and 100 kW (rated values) in one configuration. |
| E-Z4 · Current and documented | Available product with a public datasheet or product page with rated values. |
We reviewed these systems against the same rules using the public documents. If the manufacturers publish missing information, we review again at the next cut-off date.
| System | Reason |
|---|---|
| ITECH IT6000C | Admission criteria met, but evidence quality K9 = 1: all datasheets are only available as distributor copies; the admission rule K9 ≥ 3 is not met. Correction with a public source possible at any time. |
| AVL E-STORAGE SiC | Admission criterion E-Z1 not substantiated: no battery model is publicly documented for the E-STORAGE SiC (only for the sister product E-STORAGE LV); the datasheets are only available via a request form. Correction with a public source possible at any time. |
| EA PSB 10000 / EABS | Admission criterion E-Z3 not substantiated: the battery simulation is only documented for single units up to 30 kW, not in a master-slave configuration. Correction with a public source possible at any time. |
| Gustav Klein MI-TS | Admission criterion E-Z1 not met: only an adjustable internal resistance (−10 to +1000 mΩ) is documented, no open-circuit voltage depending on the state of charge. Correction with a public source possible at any time. |
| NHR 9300 | Admission criterion E-Z1 not met: “Battery Emulation” is only described as an operating state with adjustable series resistance, without open-circuit voltage depending on the state of charge. Correction with a public source possible at any time. |
| Keysight SL1800A | Admission criterion E-Z1 not met: the datasheet does not describe a battery model. Correction with a public source possible at any time. |
| Digatron BE-IGBT | Admission criterion E-Z1 not met and E-Z3 not substantiated: no battery model documented, no configuration from 300 A at 1000 V with rated values. Correction with a public source possible at any time. |
Rules for all entries: We count rated values of one configuration from public manufacturer documents. Anything not documented there counts as No or “Not documented”; the note remains visible in the cell. We only count accuracy specifications if it is clear whether they refer to measurement or setting. Corrections with a public source are possible at any time.
Manufacturers and expert users submit information and evidence via the contact form; the portal editors assign them to the criteria. We reserve the right to reject a correction without sufficient evidence.
An entry, its evidence and its review are recorded separately. Missing assignments remain open. Portal version 0.109 · data as of 2026-11-20 · data revision 1.0.
| Device | Arbin RBT-Pack (RBT45012) · battery:arbin-rbt-pack |
|---|---|
| Criterion | BC01 · Max. voltage |
| Value | 1000 V |
| Detail | No additional description |
| Unit | V |
| Configuration | Open · not assigned |
| Hardware / software / revision | Open · not assigned |
| Operating conditions | Open · not assigned |
| Cell-specific evidence | Assigned · note the review status separately |
| Document / revision / location | Arbin Instruments: RBT-Pack / RBT-High Power – product page · retrieved Nov 20, 2026 · Open · not assigned · Open · not assigned |
| Review | Under review · review date: open |
| Data as of | 2026-11-20 · data revision: 1.0 |
| Original source | Public manufacturer documents · evaluated according to BEST-Matrix v0.109 |
Locations of the evaluation according to BEST-Matrix v0.109.
Evidence class B · retrieved Nov 20, 2026
View sourceNo candidate sources stored.
4 devices · 29 technical criteria · 116 entries in the current view.
| Status | Meaning |
|---|---|
| Yes | The property is stated as available. A Yes entry alone confirms neither evidence review nor suitability for the specific test case. |
| No | According to the information, the property is not available or is not documented in the public manufacturer documents (“not publicly documented” counts as No; the note remains visible at the entry). |
| Yes, as option | Yes, as option: available as an option according to the manufacturer. Clarify equipment, prerequisites and any extra cost for the desired configuration. |
| Open / unclear | The entry is unclear or still needs to be clarified. It implies neither availability nor non-availability. |
| Partial | Only a partial scope is stated. The stated scope and its limits must be clarified for the test case. |
| Planned | The property is stated as planned. It is not treated as a function available today. |
| Not applicable | The criterion is stated as not applicable for the configuration considered. This is not a No entry. |
| Value | A numerical value or a description is available. No Yes status is derived from it; unit, conditions and configuration are recorded separately. |
| Not stated | A required value is not filled in or not documented in the public manufacturer documents. This is distinct from an explicitly unclear entry. |
The complete data set with candidate sources is not provided as a file. For questions about individual entries, use “Add question” or the contact form.
More comparisons: Battery Cycler → Battery Emulator → EVSE installation testers AC → EVSE installation testers DC and AC/DC →
Models at a glance
The overview covers all systems in this comparison. The totals refer to all recorded entries per model; filters and column highlighting in the comparison table do not change this overview.
“Yes” and “Yes, as option” remain visible separately. Each counts once for column highlighting; the number does not indicate technical suitability.
Battery Cycler · admission criteria met. Reference configuration: One chassis RBT45012: 40–1000 V, 6 channels of ±100 A in parallel → 600 A (calculated), chassis power up to 360 kW. Alternative RBT46012: 60–1500 V, 2 × ±150 A → 300 A, 360 kW (K1 = 2).
Max. voltage: 1000 V. Max. current per output: 600 A (6 × 100 A in parallel, calculated). Max. power per output: 360 kW (chassis).
29 entries: Yes: 10 · No: 4 · Yes, as option: 1 · Value: 13 · Not documented: 1.
28 of 29 entries with an assigned manufacturer source (8 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Cycler · admission criteria met. Reference configuration: One cabinet 17040E-1700V (200 kW, 1 channel), 1700 V range (30–1700 V) with max. 400 A. Without parallel fixtures (system information on this is contradictory).
Max. voltage: 1700 V. Max. current per output: 400 A. Max. power per output: 200 kW.
29 entries: Yes: 8 · No: 4 · Yes, as option: 3 · Value: 12 · Not documented: 2.
28 of 29 entries with an assigned manufacturer source (7 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Cycler · admission criteria met. Reference configuration: Largest system according to the datasheet: 64 × EA-BT 21500-60 (each 0–1500 V, ±60 A, 30 kW) on the master-auxiliary bus, 8 cabinets of 42 U → 1500 V, 3840 A (calculated 64 × 60 A), 1920 kW. A single 42U cabinet: 8 units → 1500 V / 480 A / 240 kW.
Max. voltage: 1500 V. Max. current per output: 3840 A (system, calculated 64 × 60 A). Max. power per output: 1920 kW (system).
29 entries: Yes: 5 · No: 7 · Yes, as option: 1 · Partial: 2 · Value: 12 · Not documented: 2.
28 of 29 entries with an assigned manufacturer source (11 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Cycler · admission criteria met. Reference configuration: 1 cabinet SL1740A with voltage option 50–1500 V and current option 900 A, 3 power levels, 300 kW standard power (Dynamic Power Boost 350 kW time-limited, not counted). Without parallel operation.
Max. voltage: 1500 V. Max. current per output: 900 A. Max. power per output: 300 kW.
29 entries: Yes: 6 · No: 7 · Yes, as option: 2 · Value: 12 · Not documented: 2.
28 of 29 entries with an assigned manufacturer source (10 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Emulator · admission criteria met. Reference configuration: 17040E-1700V, 1 channel, 1700 V range: 30–1700 V / 400 A / 200 kW (parallel operation of two units not counted due to contradictory information and missing voltage specification).
Max. voltage: 1700 V. Max. current per output: 400 A. Max. power per output: 200 kW.
29 entries: Yes: 3 · No: 8 · Yes, as option: 2 · Value: 12 · Not documented: 4.
22 of 29 entries with an assigned manufacturer source (6 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Emulator · admission criteria met. Reference configuration: device variant 2 × B2C+200 – Serial Mode, 1-Channel Wiring: two units in series, each wired as “Unipolar 1-channel 2Q, one global setpoint for all channels”. According to the datasheet, Serial Mode allows “80 to 1500 V (2 x Vrated)” and “0 to ± 1 x I rated – 0 to ± 2 x Prated”; the B2C+200 has 160 kW, 20–800 V and ±555 A (“Rated 1 channel Unipolar Mode”). This results in 80–1500 V, ±555 A and ±320 kW. The maximum values do not apply simultaneously: power limits the current, to 320 A at 1000 V and to about 213 A at 1500 V. That the 1-channel rated current applies in Serial Mode is our interpretation of the datasheet; confirmation by Cinergia is listed as an open point. The datasheet states dynamic and accuracy figures per unit. We do not compare the 3-channel operating mode (±185 A per channel).
Max. voltage: 1500 V (Serial Mode “80 to 1500 V (2 x Vrated)”; single unit 800 V). Max. current per output: ±555 A (Serial Mode “0 to ± 1 x I rated”; B2C+200 “Rated 1 channel Unipolar Mode” ±555 A). Max. power per output: ±320 kW (Serial Mode “0 to ± 2 x Prated”; B2C+200 160 kW).
29 entries: Yes: 3 · No: 8 · Yes, as option: 2 · Value: 11 · Not documented: 5.
22 of 29 entries with an assigned manufacturer source (9 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Emulator · admission criteria met. Reference configuration: X-HVT single unit up to 1,500 V / ±1,500 A / 1,000 kW (flyer: “single unit … up to 1,500 V, currents up to 1,500 A, and outputs up to 1,000 kW”). The product page mentions current ranges up to ±4,000 A per unit; there is no type table that relates voltage, current and power to each other → more conservative value 1,500 A.
Max. voltage: 1,500 V. Max. current per output: ±1,500 A per unit (flyer). Max. power per output: 1,000 kW.
29 entries: Yes: 5 · No: 8 · Yes, as option: 0 · Value: 10 · Not documented: 6.
20 of 29 entries with an assigned manufacturer source (9 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Battery Emulator · admission criteria met. Reference configuration: G5 standard system SYS.324.1500.648 made of G5.BAS base units 54 kW / 1,500 V (1 master .M with G5.BatSim, the others as slave .S), permanently in parallel: 0–1,500 V, ±648 A, 324 kW. Equivalent: SYS.324.1000.972 (1,000 V, 972 A, 324 kW). Smallest configuration eligible for admission: SYS.108.1000.324 (1,000 V, 324 A, 108 kW).
Max. voltage: 1,500 V (SYS.324.1500.648); alternatively SYS.324.1000.972: 1,000 V. Max. current per output: 648 A (SYS.324.1500.648, permanently in parallel). Max. power per output: 324 kW.
29 entries: Yes: 7 · No: 3 · Yes, as option: 2 · Value: 11 · Not documented: 6.
23 of 29 entries with an assigned manufacturer source (15 manufacturer sources (evidence classes A, B, C)).
Data as of: Nov 20, 2026 · data revision 1.0.
Comparative advertising: This comparison includes devices of comemso electronics GmbH. The managing director of the operator is also an employee of comemso and related to its founder. Details in the legal notice
EVSE / DC charging points · CCS2, CHAdeMO, AC/DC
Three testers for DC fast-charging stations (DC EVSE testers), two of them also for AC: charging connection, charging communication according to DIN SPEC 70121 and ISO 15118, safety tests and the limits of voltage, current and load. Measurement and calibration systems for billed energy are a different device category. All information comes from public manufacturer documents, as of November 21, 2026, with source and location for each entry. No ranking.
Public manufacturer informationWe recorded the information on November 8, 2026 from publicly accessible manufacturer documents, checked it for new and changed documents as of the cut-off date November 21, 2026, and evaluated it according to BEST-Matrix v0.109; each entry names source and location. “Not publicly documented” counts as No. There is no ranking or award – and we welcome correction notes backed by evidence.
On this page: Comparison table · Voltage, current and load · Distinction from measurement and calibration technology · Frequently asked questions
The table and downloads only show selected matches in the current filter. The type filter follows the configuration names of the devices; it does not confirm any individual test scope.
In the table: 7 of 7 device configurations · 58 criteria. Public manufacturer information, as of Nov 21, 2026.
Contains the visible devices and criteria including highlights, totals, reference configuration and sources – in the same layout as the battery comparisons. The PDF breaks at row boundaries and repeats the table header. On your first download we ask once for your name for the “Created for” line; every download is reported to us with name, company and file.
Scrolling vertically moves the page, horizontally the table; the criterion stays visible on the left. Exports use the visible selection.
| CriterionEntry per device; evidence and review status in the cell | comemso Easy Chester Ultimate (AC/DC) comemsoPublic manufacturer information | comemso Easy Chester Micro (AC) comemsoPublic manufacturer information | Fluke FEV500 CCS2 (DC) FlukePublic manufacturer information | Fluke FEV350 + 1664 FC (AC) FlukePublic manufacturer information | Metrel A 1732 + MI 3155 (AC/DC) MetrelPublic manufacturer information | Metrel A 1632 + MI 3155 (AC) MetrelPublic manufacturer information | Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) Gossen MetrawattPublic manufacturer information |
|---|---|---|---|---|---|---|---|
Configuration & deviceBestEVTestSystems.com | |||||||
| C01≠Category / active test stimulusCategory / active stimulus | Value AC/DC charging station tester with vehicle simulation and internal DC load; safety tests and fault simulation as options | Value Installation and function tester for AC charging stations; ISO 15118-2 as standard, safety tests and fault simulation as options | Value DC fast-charging station analyzer: vehicle simulation via CCS with load test, safety and interoperability tests | Value Tester for functional and safety tests at AC charging stations; insulation, protective conductor and loop impedance only with a multifunction installation tester (in the FEV350/KIT: 1664 FC) | Value DC EVSE adapter A 1732 with installation tester MI 3155: vehicle simulation for CCS2, CHAdeMO and Type 2 as well as safety tests | Value Analyzer A 1632 for AC charging points Type 1/Type 2 and charging cables (vehicle and cable simulation, CP measurement, fault simulation) with installation tester MI 3155 for the safety tests | Value Installation tester PROFITEST PRIME AC with function tester H+E EXPERT CHECK for AC charging points Mode 3 (Type 2): vehicle and cable simulation, CP measurement, fault simulation; the PRIME AC tests the protective measures via the measuring sockets; in addition dielectric strength test 2.5 kV AC |
| U15≠One device for function and safety testingAll-in-one device for configured function + electrical safety | Yes, as option Function and safety testing in one device; safety tests and fault simulation are options | Yes, as option Function and safety testing in one device; the electrical safety tests are an option | Yes Function and safety tests (continuity, insulation, IMD, residual voltage) in one device via the CCS connector | No Insulation, protective conductor resistance and loop impedance require a multifunction installation tester (in the FEV350/KIT: 1664 FC) | No Adapter A 1732 plus installation tester MI 3155 (two devices) | No Two devices: analyzer A 1632 and installation tester MI 3155 | No Two devices: EXPERT CHECK simulates the vehicle, the PRIME AC tests PE, N, L1, L2, L3 via its measuring sockets |
| R47≠Battery operation | Yes Powered via USB-C (20 V), 12 V car adapter or power bank with more than 100 W; no internal battery documented | Yes Powered via USB-C (20 V, 100 W), 12 V USB-C car adapter or your own power bank with more than 100 W USB-C output; no internal battery documented | Yes Replaceable Li-ion battery 10.8 V, 6.8 Ah, 73 Wh; approx. 10 h; charging via USB-C PD 65 W | Yes 4 × AA (alkaline LR6 or NiMH HR6) | No The A 1732 adapter requires mains power (205–254 V AC, max. 2000 VA) | Yes A 1632 with Li-ion battery 7.2 V, 4.4 Ah (charging typ. 4 h) or mains power | Yes PRIME AC: permanently installed Li-ion battery, battery operation with limited functionality; EXPERT CHECK: battery 18650, 3.7 V, 2600 mAh, charging via USB |
| R48≠Published reference weight | Value 15.7 kg | Value 5.4 kg (in the case) | Value 26 kg | Value approx. 0.9 kg without, approx. 1.4 kg with Type 1/Type 2 connector | Value 16.2 kg (A 1732 without accessories), plus MI 3155 | Value A 1632: 5.2 kg without accessories, plus MI 3155 | Value PRIME AC 15.10 kg + EXPERT CHECK 1.18 kg |
| A02≠Operator-exchangeable hardware cassettesOperator-exchangeable hardware cassettes for upgrade / repair | No Not publicly documented · as of Nov 21, 2026 · counts as No | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | No No operator-replaceable parts in the device (except fuses) | not recorded | not recorded |
| D01≠Market introduction / earliest dated evidence | Open Market introduction of the current Ultimate version not stated on the manufacturer pages | Open Market introduction of the Micro not stated on the manufacturer pages | Value Market introduction announced on May 12, 2026 | Open Market introduction not stated on the manufacturer pages | Value MI 3155 since 2018; solutions for DC charging stations (A 1732) since 2024 | Value Datasheet A 1632 dated Feb 12, 2019; MI 3155 since 2018 | Value EXPERT CHECK: datasheet 1/9.23; PRIME AC: datasheet 3/3.25 (edition 03); market introduction not stated |
Interfaces & loadsBestEVTestSystems.com | |||||||
| R01≠Testing of CCS2 DC charging stationsCCS2 DC charging-station testing | Yes, as option CCS 2 or CCS 1 depending on configuration; up to two inlets | not recorded | Yes Model FLK-FEV500/CCS2; also offered as a CCS1 model | not recorded | Yes CCS2 | not recorded | not recorded |
| R02≠CCS2 DC and Type 2 AC in one systemCCS2 DC and Type2 AC testing in one system | Yes, as option CCS 2 (DC) and AC (Type 2) depending on configuration; CCS AC optional | not recorded | No DC only, via one CCS connector | not recorded | Yes CCS2 (DC) and Type 2 (AC) in the adapter | not recorded | not recorded |
| A01≠NACS / SAE J3400 DC interface | Yes, as option NACS (SAE J3400) depending on configuration | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | No Not publicly documented · as of Nov 21, 2026 · counts as No CCS2, CHAdeMO and Type 2 are documented | not recorded | not recorded |
| R04≠AC charging function test Type 2 or Type 1Type2 or Type1 AC charging-function testing | Yes, as option AC Type 1 or Type 2 depending on configuration | Yes AC charging stations with Type 1 or Type 2, depending on configuration | No Not publicly documented · as of Nov 21, 2026 · counts as No DC only via the CCS connector; an AC charging function test is not documented | Yes AC charging stations with Type 2 or Type 1; versions TY2 and TY2/TY1 | Yes Type 2 (AC, Mode 3, EN 61851-1 low level) | Yes Type 1 and/or Type 2; Type 2 plug adapter with long CP pin in the standard set | Yes Mode 3, Type 2 socket or permanently attached Type 2 cable (extended CP test pin); Type 1 not intended |
| R05≠DC charging function for 400 V vehicle technologysimulated | Yes Battery emulation approx. 330 V (400 V vehicle) | not recorded | Yes Load test up to 330 V | not recorded | Yes Simulated battery 280–310 V | not recorded | not recorded |
| R06≠DC charging function for 800 V vehicle technologysimulated | Yes Battery emulation approx. 660 V (800 V vehicle) | not recorded | No Published load test limit 330 V | not recorded | No Simulated battery 280–310 V; 800 V technology not covered | not recorded | not recorded |
| R07≠CHAdeMO charging function testCHAdeMO charging-function testing | Yes, as option CHAdeMO up to version 2.0 depending on configuration | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | Yes CHAdeMO from version 0.9.1 | not recorded | not recorded |
| R08a≠Internal DC test loadloaded | Yes Internal DC load 2 kW / 6 A up to 45 s | not recorded | Yes Simulated charging load 2 kW (overview: up to 2.4 kW); load power measuring range 0–3.75 kW | not recorded | Yes Charging current approx. 4.9 A at 300 V (calculated approx. 1.5 kW) | not recorded | not recorded |
| R08b≠Real AC power load included | No Not publicly documented · as of Nov 21, 2026 · counts as No An AC power load is not documented | No Not publicly documented · as of Nov 21, 2026 · counts as No A power load is not documented | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No Power consumption max. 3 W; a power load is not documented | No Not publicly documented · as of Nov 21, 2026 · counts as No No load is specified for AC | No Not publicly documented · as of Nov 21, 2026 · counts as No A power load is not documented; the charging current is calculated from the CP signal | No No power load; no consumers may be operated on the measuring sockets and the earthed (Schuko) socket |
| R09≠Optional 30 kW DC test loadloaded | Yes, as option External DC load 30 kW / 90 A up to 4 h | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | No Not publicly documented · as of Nov 21, 2026 · counts as No | not recorded | not recorded |
| R10≠Optional 60 kW DC test loadloaded | Yes, as option Two external DC loads: 60 kW / 180 A up to 4 h | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | No Not publicly documented · as of Nov 21, 2026 · counts as No | not recorded | not recorded |
| R11≠Duration of DC CCS chargingDC CCS charging durationloaded | Value up to 45 s with internal load (2 kW / 6 A) | not recorded | Not stated Not publicly documented · as of Nov 8, 2026 · not stated Maximum duration of the load test not stated on the manufacturer pages | not recorded | Value Adapter alone: stop after 20 s; adjustable with MI 3155 (tcharge), maximum value not stated | not recorded | not recorded |
| R14≠Extended DC charging durationloaded | Yes, as option Long Duration Unit up to 60 min; external DC loads up to 4 h | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No | not recorded | Open Charging duration adjustable with MI 3155; maximum value not stated | not recorded | not recorded |
| R15≠Voltage measuring range per interfaceVoltage measurement range by interfacemeasured | Value DC 0–1000 V, ±(1 V + 0.5 %); AC 0–250 V, ±0.1 V | Value 0–250 V AC, ±0.1 V | Value Load voltage 1000 V range, ±(0.2 % + 4 digits) | Value 0–253 V (L-N, L-PE, N-PE), 0–440 V (L-L); ±(3 % + 3 digits) | Value DC+/DC− 0–550 V, ±(3 % + 2 digits) | Value A 1632: 100–440 V AC, ±(2 % + 2 digits); phase rotation | Value PRIME AC: voltage and frequency up to 1 kV, single- and three-phase, phase rotation; EXPERT CHECK: voltages of all three phases and N |
| R16≠Measuring range of the actual DC charging currentActual DC charging-current measurement rangemeasured | Value 0–10 A, ±0.5 A; with external DC load 0–200 A | not recorded | Value Load current 10 A range, ±(0.5 % + 5 digits) | not recorded | Value 0.0–6.9 A, ±(3 % + 2 digits) | not recorded | not recorded |
| R22≠Guided test procedure | Yes Guided procedure in five steps: connect, select, test, evaluate, report | Yes Guided procedure on the touchscreen, step by step through each test | Yes Guided autotest with clear PASS/FAIL | Yes Guided procedures, predefined test plans, auto sequence and expert mode | Partial Auto sequence for AC EVSE in the MI 3155; for DC EVSE, according to Metrel, currently no auto sequence (individual tests) | Partial Test sequences in the MI 3155, including a complete RCD sequence with 6 mA DC ramp; a guided overall procedure with the A 1632 is not documented | Yes AUTO test sequences on the PRIME AC (up to 200 steps); guided documentation of the charging point test (states A–E) in the EXTRA menu, described for adapters from MENNEKES, WALTHER and HENSEL |
| R17≠Charging communication DIN SPEC 70121DIN SPEC 70121 charging communication | Yes DIN 70121 | not recorded | Yes DIN SPEC 70121 | not recorded | Yes DIN SPEC 70121 | not recorded | not recorded |
| R18≠Charging communication ISO 15118: DCISO 15118 charging communication: DC | Yes, as option ISO 15118-2 with EIM for DC; optional according to the datasheet | not recorded | Yes ISO 15118 (parts not stated) | not recorded | Yes ISO 15118 for CCS (standard), alternatively DIN SPEC 70121 | not recorded | not recorded |
| U01≠Charging communication ISO 15118: ACISO 15118 charging communication: AC | Yes, as option ISO 15118-2 with EIM for AC; optional according to the datasheet | not recorded | No Not publicly documented · as of Nov 8, 2026 · counts as No DC only; AC communication not documented | not recorded | No AC communication according to EN 61851-1 (low level) | not recorded | not recorded |
| P15118≠Charging communication ISO 15118-2 / -3: documented scopeISO 15118-2 / -3 charging communication: documented scope | Yes, as option ISO 15118-2 with EIM; ISO 15118-3 optional for DC | Yes ISO 15118-2 with EIM and ISO 15118-3 for AC standard conformity, as standard; connection setup according to ISO 15118-3 (SLAC) with attenuation value in the report | Partial ISO 15118 mentioned, without stating the parts | No Not publicly documented · as of Nov 21, 2026 · counts as No ISO 15118 / PLC not documented; designed according to IEC/EN 61851-1 | Partial Only ISO 15118-1 is mentioned; -2 and -3 not explicitly | No Not publicly documented · as of Nov 21, 2026 · counts as No ISO 15118 / PLC not documented | No Not publicly documented · as of Nov 21, 2026 · counts as No ISO 15118 / PLC not documented in datasheets and manuals |
| PTLS≠ISO 15118-2 charging communication with TLS | No According to the manufacturer, TLS-secured charging sessions are outside the scope | No According to the manufacturer, TLS-secured charging sessions are outside the test scope | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| P20≠Charging communication ISO 15118-20ISO 15118-20 charging communication | Planned ISO 15118-20 planned for Q1/2027, not yet available | Planned ISO 15118-20 planned for Q1/2027, not yet available | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| P20TLS≠ISO 15118-20 charging communication with TLS | No According to the manufacturer, TLS is outside the released and planned scope | No According to the manufacturer, TLS is outside the test scope | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| R20≠IEC 61851-1 control pilot signalingIEC 61851-1 Control Pilot signalling | Yes IEC 61851-1; CP voltage −13 to +13 V (±0.1 V), duty cycle 3–97 %, CP states A1 to F | Yes CP voltage −13 to +13 V (±0.1 V), duty cycle 3–97 % and CP states A1 to F | Yes CP states A–E simulated and tested; CP ±15 V | Yes Automatic CP test with waveform analysis; simulation of states A–D as well as CP faults, diode short circuit and PE faults | Yes CP states A, B, C and fault; fault simulation CP open, PE open, CP short | Yes CP states A, B, C, D are simulated (±1.5 %) | Yes Vehicle simulation CP A, B, C and D (with ventilation) on the EXPERT CHECK. Caveat: according to its manual, it is not intended as an adapter for vehicle simulation according to VDE 0122-1 for standard-compliant testing of charging infrastructure; clarification with Gossen Metrawatt pending |
| CPM≠Measure CP signal (voltage, duty cycle)Control Pilot signal measurement | Yes CP voltage −13 to +13 V (±0.1 V), duty cycle 3–97 % and CP states A1 to F are measured | Yes CP voltage −13 to +13 V (±0.1 V), duty cycle 3–97 % and CP states A1 to F are measured | Yes CP high and low −15 to +15 V (±(0.4 % + 2 digits)), duty cycle 2–98 %, frequency 900–1100 Hz | Yes CP voltage −15 to +15 V (±0.5 %), PWM duty cycle 3–97 % (±5 digits), frequency 0.9–1.1 kHz; automatic CP test with waveform analysis | Open A CP measurement is not explicitly documented; in the troubleshooting section the manual mentions a “duty cycle” of 0–100 % without reference to the signal | Yes UCP+ and UCP− −19.99 to 19.99 V, frequency 500–1500 Hz, duty cycle 0.1–99.9 % | Yes Positive and negative PWM voltage, duty cycle and frequency; the waveform is shown by an external oscilloscope at the CP socket |
| R23≠SLAC matching | Yes, as option SLAC via ISO 15118-3 (PLC), optional for DC according to the product page | not recorded | Yes SLAC test with signal strength 0–20 dB (good: 0–10 dB) | not recorded | Yes SLAC in the CCS sequence; attenuation value not documented | not recorded | not recorded |
Electrical safetyBestEVTestSystems.com | |||||||
| R33≠Insulation resistance: tester-generated voltageInsulation-resistance measurement: tester-generated voltage | Yes, as option Insulation resistance (RISO) selectable at 250, 500, 750 or 1000 V, on the grid and connector side; option | Yes, as option Insulation resistance between live conductors and PE selectable at 250, 500, 750 or 1000 V; safety tests are an option | Yes Insulation resistance at 500 V (EVSE up to 500 V) or 1000 V (above 500 V) | Yes Insulation resistance at 500 V – only with a multifunction installation tester (in the FEV350/KIT: 1664 FC) | Yes Insulation resistance up to 1000 V DC (MI 3155 via A 1732) | Yes Insulation resistance with the MI 3155 (test according to EN 60364-6) | Yes Insulation resistance at 50–1000 V DC, constant or as a ramp (PRIME AC) |
| R34≠Measurement of the DC terminal voltageDC terminal-voltage measurement | Yes DC voltage 0–1000 V at the DC connector, ±(1 V + 0.5 %) | not recorded | Yes Cable check voltage DC+/PE and DC−/PE in the load test | not recorded | Yes Voltage measurement DC+/DC− 0–550 V at the adapter | not recorded | not recorded |
| R35≠Recording of DC charging voltage, current and powerActual DC charging-voltage, current and power recordingmeasured | Yes Report with voltage, current and maximum charging power | not recorded | Yes Load voltage, load current and load power (0–3.75 kW) are measured | not recorded | Partial Voltage and current in the live view; power not documented separately | not recorded | not recorded |
| R36≠PP voltage and resistance recorded numerically | Yes PP resistance 0–4600 Ω (±5 %) and PP voltage (±5 %) are measured | Yes PP resistance 0–4600 Ω (±5 %) and PP voltage (±5 %) are measured | Partial PP resistance 50–5000 Ω; PP voltage not documented | Yes PP voltage 0.10–15.00 V, ±(1.0 % + 3 digits) (Type 2 with socket); PP resistance 50.0–5000 Ω (Type 2 with cable); PP simulation 13–63 A and fault state | No Not publicly documented · as of Nov 21, 2026 · counts as No PP only simulated as fault resistances 100, 220, 680 and 1500 Ω; no PP measurement documented | No Not publicly documented · as of Nov 21, 2026 · counts as No PP simulation n.c., 13, 20, 32, 63 and 80 A (±1.5 %); a PP measurement is not documented | No Not publicly documented · as of Nov 8, 2026 · counts as No PP simulation N.C., 13 A (1.5 kΩ), 20 A (680 Ω), 32 A (220 Ω), 63 A (100 Ω); a PP measurement is not documented |
| R39≠Protective conductor continuity / low-resistance measurementProtective conductor continuity / low resistance | Yes, as option Protective conductor resistance (RPE) at 200 mA or 25 A; option | Yes, as option Protective conductor resistance (RPE) at 200 mA or 25 A; option | Yes Continuity (RLO) with up to 10 A, 2 Ω range, via the CCS socket | Yes Protective conductor resistance (RLO) with more than 200 mA – only with a multifunction installation tester (in the FEV350/KIT: 1664 FC) | Yes 4-wire Rlow at 200 mA via MI 3155 | Yes Protective conductor / low resistance (Rlow) with the MI 3155 | Yes Protective conductor resistance RLO at 0.2 A (constant or ramp, polarity selectable) and at 25 A (PRIME AC) |
| GRIDZS≠Grid-side loop impedance of the installationGrid-side installation loop impedance | Yes, as option Loop impedance Zs (L-PE) at 15 mA / 15 A and line impedance L-N; option | Yes, as option Loop impedance ZS with test current 15 mA / 15 A between phase and PE or N; option | No Not publicly documented · as of Nov 21, 2026 · counts as No Not documented; according to the manufacturer page, tests via the CCS connector | Yes Loop/line impedance without tripping – only with a multifunction installation tester (in the FEV350/KIT: 1664 FC) | Yes Loop/line impedance via MI 3155 (Zdc for DC EVSE) | Yes Loop impedance Zs (RCD) without tripping 6 mA DC EV RCDs or EV RCMs | Yes Loop impedance with full wave 10 A AC/DC; without RCD tripping using the 15 mA method or DC saturation (PRIME AC) |
| RCD≠AC RCD trip testAC RCD trip testing | Yes, as option Residual current test tRCD at 6, 30, 100 or 300 mA, AC or DC; option | Yes, as option Trip test at 6, 30, 100 or 300 mA (AC) per phase L1 to L3; option | No Not publicly documented · as of Nov 21, 2026 · counts as No Not documented; according to the manufacturer page, tests via the CCS connector | Yes RCD 30 mA type A, B/B+ and RDC-PD in the device (100–253 V AC) | Yes RCD tests with MI 3155; the auto sequence for AC EVSE trips the RCD of the EVSE | Yes Complete RCD test sequence with the MI 3155 | Yes RCD types A, AC, F, B, B+, EV, MI, G/R as well as SRCD, PRCD and RCBO; tripping current by ramp and tripping time (PRIME AC) |
| RDCDD≠Trip test 6 mA RDC-DD6 mA RDC-DD trip testing | Yes, as option Residual current test with 6 mA DC selectable on the vehicle side; the term RDC-DD is not used; option | Yes, as option Residual current test (tRCD) with 6 mA DC on the vehicle side; the term RDC-DD is not used; the safety tests are an option | No Not publicly documented · as of Nov 21, 2026 · counts as No Not documented; according to the manufacturer page, tests via the CCS connector | Yes RDC-DD 6 mA in the device: tripping time at 3, 6, 60 and 200 mA DC; ramp 2.0–6.0 mA | Yes RDC-DD according to IEC 62955 with 6 mA DC test current (MI 3155) | Yes 6 mA DC ramp test for EV RCDs and EV RCMs with MI 3152 or MI 3155 | Yes 6 mA RDC-DD and RCMB: test at 6–200 mA, tripping time at 6 mA at most 10 s (PRIME AC) |
| UOFF≠Uoff: voltage after switch-offUoff – voltage after switch-off | Yes, as option Passed if the voltage falls below 30 V (RMS, AC) or 60 V (DC) in less than 1 s; option | Yes, as option Passed if the voltage falls below 30 V (RMS, AC) in less than 1 s; in the event of communication errors, the disconnection time is not evaluated; fault simulation is an option | Yes Residual voltage test in the autotest: below 60 V DC within 1 s | No Not publicly documented · as of Nov 8, 2026 · counts as No | Yes Discharge time to below 60 V after opening the simulated vehicle contactor (0–9.99 s) and toff after fault tripping | Partial Disconnection time Toff 0–399 ms, ±(1 % + 5 digits); a voltage limit after switch-off is not documented | Partial tOFF (state E) is tested, the tripping time is displayed for PE faults; a voltage limit after switch-off is not documented |
| FSIM≠Fault simulation at the charging point (diode, CP-PE, PE)Fault simulation at the charging point | Yes, as option PE interruption, CP short circuit, PP short circuit and PP interruption as well as AC and DC insulation faults; diode faults not documented; option | Yes, as option PE interruption, CP and PP short circuit, PP interruption as well as AC insulation fault; diode faults not documented; option | Partial States A–E are simulated and validated (E = CP fault); diode faults and PE interruption are not documented | Yes CP fault E (0 Ω or 120 Ω), diode short circuit and PE faults (earth fault / PE open) | Yes CCS and AC: CP open, PE (PP) open, CP short-circuited (80 Ω); CHAdeMO: CP 3 open, PE open, CAN stop | Yes CP-PE short circuit (Error 2), diode short-circuited, PE open; conductor interruptions for Mode 2 cables | Yes Diode test, CP-PE short circuit (state E), PE fault with display of the tripping time (< 100 ms) |
| R42≠DC IMD response / insulation fault testDC IMD response / isolation-fault test | Yes, as option DC insulation fault simulation with 11 resistance values from 47 to 780 kΩ (DC+/PE or DC−/PE), optionally during the cable check or while charging; AC 2.5 kΩ per phase; option | not recorded | Yes IMD test with 250 kΩ (without tripping) and 95 kΩ or 45 kΩ (tripping), each max. 15 s | not recorded | Yes Asymmetrical IMD test with fault resistance 20–640 kΩ in 5 kΩ steps | not recorded | not recorded |
Operation & reportsBestEVTestSystems.com | |||||||
| R45≠PDF test reports | Yes PDF report with comments, address fields and company logo; result PASSED or FAILED; one report with all tests per charging point; HTML report as an option (maintenance package) | Yes PDF report with comments, address fields and company logo; one report with all tests per charging point; HTML report as an option (maintenance package) | Yes Reports via TruTest (data via USB-C); PDF in TruTest Lite or Advanced | Yes PDF reports via TruTest (Lite or Advanced) on a Windows PC | Yes, as option Simple PDF test report with the aMESM app (Android, license); Metrel ES Manager saves and prints reports | Yes, as option PDF test report with the aMESM app (Android, license); station and cable reports with the MESM PC software | Yes PDF test record (“Universalprotokoll als pdf”) with the IZYTRONIQ Business Starter PC software; registration key included with the PRIME AC |
| U02≠Touchscreen operation | Yes 10.1-inch touchscreen | Yes 10.1-inch touchscreen | Yes 7-inch touchscreen, capacitive, operable with protective gloves | No Not publicly documented · as of Nov 21, 2026 · counts as No Color display; touchscreen not documented | Yes MI 3155 with 4.3-inch color touchscreen; A 1732 with keys and LEDs | Yes MI 3155 with 4.3-inch color touchscreen; A 1632 with keys | No PRIME AC: dot-matrix display b/w, 128 × 128 pixels, operation via rotary switch and softkeys; EXPERT CHECK: monochrome display |
| U03≠Guidance from test selection to report | Yes Guided procedure on the device through to the PDF report | Yes Guided procedure on the device through to the test report with PDF export | Yes Guided autotest; data via USB-C to TruTest for the reports | Yes Guided procedures; create test plans in TruTest and transfer them to the FEV350, results back for the report | Partial AC: auto sequence in the MI 3155; DC: individual tests, save results, report via Metrel ES Manager | Partial Test sequences in the MI 3155 and saving of results; the report is created by the MESM PC software or the aMESM app | Partial AUTO test sequences on the PRIME AC, PDF record in IZYTRONIQ on the PC; the EXPERT CHECK does not save results |
| U04≠Firmware/software update directly over the air (without PC)Firmware / software updates directly over the air (no PC) | Yes, as option Firmware updates over the air (FOTA) via hotspot; part of the maintenance package | Yes, as option Firmware updates over the air (FOTA) via mobile hotspot; part of the maintenance package | No Firmware update via USB-C stick | No Not publicly documented · as of Nov 21, 2026 · counts as No According to the manufacturer page, firmware via TruTest (PC software); over-the-air update not documented | No A 1732: firmware via USB from the PC (FlashMe) | No Not publicly documented · as of Nov 21, 2026 · counts as No Over-the-air firmware update is not documented | No Firmware update via USB |
| U05≠GPS address and map in the reportGPS-derived address and map in report | Yes, as option GPS address and map in the report; with maintenance package | Yes, as option Address and map from GPS coordinates in the report; with maintenance package | No Not publicly documented · as of Nov 21, 2026 · counts as No According to the manufacturer page, GNSS is used for time synchronization; address and map in the report not documented | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| U06≠Inspection/damage photos in the reportInspection / damage photos in report | Yes, as option Inspection photos in the report; with maintenance package | Yes, as option Take photos of the inspection or of damage with the smartphone and insert them directly into the report; with maintenance package | Partial Photos and files can be attached to remarks afterwards in TruTest (Advanced), not on site on the device; TruTest runs under Windows | Partial Photos and files can be attached to remarks afterwards in TruTest (Advanced), not on site on the device; TruTest runs under Windows, not on the smartphone | Yes, as option Text, image, video or voice for test results in the aMESM app (Android, license) | Yes, as option Text, image, video or voice for test results in the aMESM app (Android, license) | Yes, as option Images and photos in the test record with IZYTRONIQ Business Professional (included in the PRIME AC professional package M516M) |
| U07≠PDF export directly from the device with all tests in one documentPDF export directly from device, all tests in one document | Yes One test report with all tests; PDF export directly on the device via smartphone | Yes One test report with all tests; PDF export directly on the device via smartphone | No Not publicly documented · as of Nov 21, 2026 · counts as No PDF only via TruTest on the PC | No Not publicly documented · as of Nov 21, 2026 · counts as No PDF only via TruTest on the PC | No Not publicly documented · as of Nov 21, 2026 · counts as No PDF via Metrel ES Manager (PC) or the aMESM app; directly on the device not documented | No Not publicly documented · as of Nov 21, 2026 · counts as No PDF via MESM (PC) or the aMESM app; directly on the device not documented | No Not publicly documented · as of Nov 8, 2026 · counts as No Push print via Bluetooth or USB; a PDF directly on the device is not documented |
| U08≠Sending reports by e-mail from the deviceE-mail report transfer from device | Yes Sending reports by e-mail via smartphone; hotspot and e-mail address required | Yes Sending reports by e-mail via smartphone; hotspot and e-mail address required | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| U09≠Report access on the smartphoneReport access on smartphone | Yes Open the test report directly on the smartphone and send it by e-mail from there | Yes Review the test report directly on the smartphone and send it by e-mail from there | No Not publicly documented · as of Nov 21, 2026 · counts as No According to the manufacturer page, TruTest is for Windows; smartphone access not documented | No Not publicly documented · as of Nov 21, 2026 · counts as No According to the manufacturer page, TruTest is for Windows; smartphone access not documented | Yes, as option aMESM app for Android; full version with license P 1102-AND | Yes, as option aMESM app for Android (full version with license P 1102-AND); free eMobility app for functional tests only | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| U10≠Multilingual learning videos | Yes Integrated videos and digital manual in several languages; in addition e-learning videos on the comemso academy (with maintenance package) | Yes, as option Multilingual learning videos on the comemso academy platform, not on the device; with maintenance package | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| U12≠Automatic detection of inlet / charging procedureAutomatic inlet / charging-procedure recognition | Yes Automatic detection of the charging method at the plugged-in charging connector | not recorded | Partial Plugging in is detected; one fixed CCS connector, no detection of multiple inlets | not recorded | No Charging system (CCS, CHAdeMO, AC) is selected by key | not recorded | not recorded |
| U13≠Automatic self-test of internal modulesAutomatic internal-module self-test | Yes Automatic self-test at every power-on | Yes Automatic self-test at every power-on; diagnostics | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | Partial Self-test on demand with test patterns for display and LEDs; the device automatically detects connection faults to the installation |
| U14≠Remote support on the device | Yes, as option Remote support via hotspot during comemso office hours; part of the maintenance package | Yes, as option Remote support via mobile hotspot, only during comemso office hours; part of the maintenance package | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 21, 2026 · counts as No | No Not publicly documented · as of Nov 8, 2026 · counts as No |
| U1≠Programmable test sequenceprogrammable workflow | Planned Programmable test sequence announced (“Coming soon”), without a date | Planned Programmable test sequence announced (“Coming soon”), without a date | No Not publicly documented · as of Nov 8, 2026 · counts as No | Yes, as option Create your own test plans in TruTest and transfer them directly to the FEV350 (TruTest license) | Yes, as option Custom auto sequences (custom-defined test sequences), programmed in Metrel ES Manager; according to the 2026 datasheet only with an MESM PRO license | Yes, as option Custom auto sequences in the MI 3155, programmed in Metrel ES Manager; according to the 2026 datasheet only with an MESM PRO license | Yes Create test sequences in IZYTRONIQ on the PC, transfer up to 10 to the device |
Totals, configuration and sourcesBestEVTestSystems.com | |||||||
| ΣTotal per status | Yes: 20 · Yes, as option: 25 · Planned: 2 · No: 4 · Open: 1 · Value: 6 · Total: 58 Yes and Yes, as option combined: 45 · not a rating | Yes: 14 · Yes, as option: 13 · Planned: 2 · No: 3 · Open: 1 · Not applicable: 21 · Value: 4 · Total: 58 Yes and Yes, as option combined: 27 · not a rating | Yes: 20 · Partial: 5 · No: 26 · Value: 6 · Not stated: 1 · Total: 58 Yes and Yes, as option combined: 20 · not a rating | Yes: 14 · Yes, as option: 1 · Partial: 1 · No: 16 · Open: 1 · Not applicable: 21 · Value: 4 · Total: 58 Yes and Yes, as option combined: 15 · not a rating | Yes: 20 · Yes, as option: 4 · Partial: 4 · No: 21 · Open: 2 · Value: 7 · Total: 58 Yes and Yes, as option combined: 24 · not a rating | Yes: 11 · Yes, as option: 4 · Partial: 3 · No: 14 · Not applicable: 21 · Value: 5 · Total: 58 Yes and Yes, as option combined: 15 · not a rating | Yes: 13 · Yes, as option: 1 · Partial: 3 · No: 15 · Not applicable: 21 · Value: 5 · Total: 58 Yes and Yes, as option combined: 14 · not a rating |
| C02≠Reference configurationSelected device configuration | Value Easy Chester Ultimate with CCS 2 (DC) and AC (Type 2); safety tests, fault simulation and ISO 15118 as options | Value Easy Chester Micro (Type 1 or Type 2) with ISO 15118-2 (as standard) and the options safety tests and fault simulation | Value FEV500/CCS2 with TruTest license for the reports | Value FEV350/KIT (Type 1/Type 2 adapter, 1664 FC) + TruTest license Lite or Advanced (separate; included in the PRO versions, which come without the 1664 FC) | Value A 1732 DC EVSE Adapter + MI 3155 EurotestXD (CCS2, CHAdeMO, Typ 2) | Value A 1632 eMobility Analyser (standard set with Type 2 plug adapter, long CP pin) + installation tester MI 3155 EurotestXD; eMobility app free of charge | Value PROFITEST PRIME AC (M516H) + H+E EXPERT CHECK (M525R); according to the datasheet (“PROFITEST MF / PROFITEST PRIME AC”) and the PRIME AC manual, the latter's accessory for AC charging points. For the caveat on vehicle simulation, see IEC 61851-1 control pilot signaling |
| Sources and evidence | 2 assigned · 0 candidate sources | 3 assigned · 0 candidate sources | 8 assigned · 0 candidate sources | 4 assigned · 0 candidate sources | 8 assigned · 0 candidate sources | 6 assigned · 0 candidate sources | 7 assigned · 0 candidate sources |
| BestEVTestSystems.comData as of: Nov 21, 2026 (public manufacturer information, evaluation BEST-Matrix v0.109) · comparison version 0.109Evidence per entry in the cell details · no ranking | |||||||
No criteria for this view.
Data as of: Nov 21, 2026 · public manufacturer sources (product pages, datasheets, manuals) · evaluation BEST-Matrix v0.109. The short summaries and short criterion titles are editorial; source and location are given for every entry in the cell details.
The basis is publicly accessible manufacturer documents, recorded on November 8, 2026 and checked for new and changed documents as of the cut-off date November 21, 2026. Each entry names source and location; the origin “Evaluation BEST-Matrix v0.109, as of …” gives the date on which we last checked the entry against its sources. If a source could not be retrieved automatically on the cut-off date (robots.txt or the manufacturer's bot block), the earlier review date remains. If we could not retrieve a source, it remains marked as a candidate source at the entry.
Anything not publicly documented we count as No – as in all comparisons and equally for all manufacturers. The field then shows “Not publicly documented · as of [review date] · counts as No”. “Yes, as option” means: full function only with additional equipment, a package or a license; “Partial” means: limited scope. We show planned, open and “not applicable” separately. A Yes is a manufacturer statement for the stated configuration and not a confirmation that the device fully complies with a standard. AC devices and DC load testers have different test scopes, which is why there are two views.
Your preselection
What counts is what is currently in the table. The information is based on public manufacturer documents and is under review; even a Yes does not replace evidence for your specific configuration.
“Add question” does not change any entry in the table – you only note a query. The status symbols still show the manufacturer information.
“Add question” collects a query about the criterion; it appears under “My questions”. There you choose the route: clarification by the portal or a request to the manufacturer. Both lead to the contact form; nothing is sent while collecting.
Want to clarify open entries in a targeted way? Our guide with procurement checklist shows which questions are worth asking.
An entry, its evidence and its review are recorded separately. Missing assignments remain open. Portal version 0.109 · data as of 2026-11-21 · data revision 1.0.
| Device | comemso Easy Chester Ultimate (AC/DC) · evse:ultimate |
|---|---|
| Criterion | C01 · Category / active test stimulus |
| Value | AC/DC charging station tester with vehicle simulation and internal DC load; safety tests and fault simulation as options |
| Detail | No additional description |
| Unit | Open · not assigned |
| Configuration | Open · not assigned |
| Hardware / software / revision | Open · not assigned |
| Operating conditions | Open · not assigned |
| Cell-specific evidence | Assigned · note the review status separately |
| Document / revision / location | Ultimate current product page · retrieved Nov 21, 2026 · product description · Open · not assigned; Easy Chester Ultimate – extended datasheet Rev_01_04 (version of Nov 10, 2026) · retrieved Nov 21, 2026 · pp. 2–3 · Open · not assigned |
| Review | Under review · review date: open |
| Data as of | 2026-11-21 · data revision: 1.0 |
| Original source | Public manufacturer documents · evaluation BEST-Matrix v0.109, as of 2026-11-21 |
Locations of the evaluation according to BEST-Matrix v0.109.
Manufacturer source · retrieved Nov 21, 2026
View sourceManufacturer source · retrieved Nov 21, 2026
View sourceNo candidate sources stored.
7 devices · 58 technical criteria · 406 entries in the current view.
| Status | Meaning |
|---|---|
| Yes | The property is stated as available. A Yes entry alone confirms neither evidence review nor suitability for the specific test case. |
| No | According to the information, the property is not available or is not documented in the public manufacturer documents (“not publicly documented” counts as No; the note remains visible at the entry). |
| Yes, as option | Yes, as option: available as an option according to the manufacturer. Clarify equipment, prerequisites and any extra cost for the desired configuration. |
| Open / unclear | The entry is unclear or still needs to be clarified. It implies neither availability nor non-availability. |
| Partial | Only a partial scope is stated. The stated scope and its limits must be clarified for the test case. |
| Planned | The property is stated as planned. It is not treated as a function available today. |
| Not applicable | The criterion is stated as not applicable for the configuration considered. This is not a No entry. |
| Value | A numerical value or a description is available. No Yes status is derived from it; unit, conditions and configuration are recorded separately. |
| Not stated | A required value is not filled in or not documented in the public manufacturer documents. This is distinct from an explicitly unclear entry. |
The complete data set with candidate sources is not provided as a file. For questions about individual entries, use “Add question” or the contact form.
All entries in this comparison are based on these publicly accessible manufacturer documents (product pages, datasheets, manuals), recorded on November 8, 2026, checked for new and changed documents as of the cut-off date November 21, 2026, and evaluated according to BEST-Matrix v0.109. The location is given for every entry in the cell details. Anything not documented there counts as No.
Fluke · Fluke FEV500 CCS2 (DC) · the manufacturer's robots.txt blocks automated retrieval (as of Nov 21, 2026) – entries based on it remain candidate sources until the editors provide the document
View sourceFluke · Fluke FEV500 CCS2 (DC) · the manufacturer's robots.txt blocks automated retrieval (as of Nov 21, 2026) – entries based on it remain candidate sources until the editors provide the document
View sourceFluke · Fluke FEV500 CCS2 (DC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC) · retrieved on Nov 21, 2026
View sourcecomemso · comemso Easy Chester Micro (AC) · retrieved on Nov 21, 2026
View sourcecomemso · comemso Easy Chester Ultimate (AC/DC) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV500 CCS2 (DC) · as of May 12, 2026 · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC), Metrel A 1632 + MI 3155 (AC) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV500 CCS2 (DC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC), Metrel A 1632 + MI 3155 (AC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV500 CCS2 (DC), Fluke FEV350 + 1664 FC (AC) · checked by the editors on Nov 8, 2026
View sourceFluke · Fluke FEV350 + 1664 FC (AC) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV350 + 1664 FC (AC) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV500 CCS2 (DC), Fluke FEV350 + 1664 FC (AC) · retrieved on Nov 21, 2026
View sourcecomemso · comemso Easy Chester Micro (AC) · version Rev_01_02 (PDF of Nov 10, 2026) · retrieved on Nov 21, 2026
View sourcecomemso · comemso Easy Chester Micro (AC) · retrieved on Nov 21, 2026
View sourcecomemso · comemso Easy Chester Ultimate (AC/DC) · version Rev_01_04 (PDF of Nov 10, 2026) · retrieved on Nov 21, 2026
View sourceFluke · Fluke FEV500 CCS2 (DC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC), Metrel A 1632 + MI 3155 (AC) · version Ver. 1.8.10 · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1632 + MI 3155 (AC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1632 + MI 3155 (AC) · as of Feb 12, 2019 · retrieved on Nov 21, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · version 3/3.25 · checked by the editors on Nov 8, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · version 1/3.25 · checked by the editors on Nov 8, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · version 1/9.23 · checked by the editors on Nov 8, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · version 1/9.23 · checked by the editors on Nov 8, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · retrieved on Nov 21, 2026
View sourceGossen Metrawatt · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · retrieved on Nov 21, 2026
View sourceIZYTRON (Gossen Metrawatt group) · Gossen Metrawatt PROFITEST PRIME AC + H+E EXPERT CHECK (AC) · retrieved on Nov 21, 2026
View sourceMetrel · Metrel A 1732 + MI 3155 (AC/DC), Metrel A 1632 + MI 3155 (AC) · version 2026 (PDF of Oct 7, 2026) · retrieved on Nov 21, 2026
View sourceScope
Very different devices are offered under terms such as “DC tester” or “charging station tester”. This comparison contains portable devices for on-site testing at the charging station: they simulate the vehicle and test function, charging communication and electrical safety – as one device or as a combination of a charging station adapter and an EVSE installation tester. We classify a device according to what it does according to the manufacturer's documents – not according to its product name.
| Device category | What is tested or measured? | Typical use | In this comparison? |
|---|---|---|---|
| DC charging station tester (DC EVSE tester, EV simulator) | The charging function with a simulated vehicle: charging connection, charging communication (e.g. DIN SPEC 70121, ISO 15118), charging release with a small load, protective functions such as insulation monitoring and residual voltage | Commissioning, maintenance, on-site troubleshooting | Yes |
| EVSE installation tester (safety tester for charging stations) | The electrical safety of the installation: e.g. protective conductor, insulation resistance, loop impedance, residual current device | Initial and periodic verification of the electrical installation | Yes |
| Power meter, power analyzer | Measures voltage, current, power and energy, often very accurately; does not simulate a vehicle and does not test a charging sequence | Measurement and analysis, development | No |
| Test and calibration system for energy measurement | Whether the charging station measures the billed energy correctly – with a reference measurement; for billing-relevant measurement, a matter of metrology and calibration law | Metrological testing, calibration | No |
| Load system (load bank) | Loads the charging station up to its rated power; shows whether it delivers this power over time | Acceptance, full-load and endurance tests | No – testers may offer loads as an option (see table) |
| Laboratory, conformance and EOL test system | Systematic testing of charging stations or charging electronics, e.g. communication conformance or end-of-line testing in production | Development, certification, production | No |
| EVSE emulator (charging station simulator) | Conversely simulates the charging station in order to test vehicles and their charging technology | Vehicle development and testing | No |
| Battery Emulator | Replaces the vehicle battery when testing an inverter, e-axle or on-board charger | Component testing in the lab | Separate comparison: Battery Emulator |
A charging station tester does not replace a metrological test of the billed energy – and a calibration system does not replace a function and safety test. Which tests are required for your charging station depends on the application; clarify this with your qualified electrician or testing body.
More comparisons: EVSE installation testers AC → EVSE installation testers DC and AC/DC → Battery Cycler → Battery Emulator →
Models at a glance
The overview shows the device configurations of this view. The totals refer to the criteria of the respective view (AC or DC and AC/DC); filters and column highlighting in the comparison table do not change this overview.
“Yes” and “Yes, as option” remain visible separately. Each counts once for column highlighting; the number does not indicate technical suitability.
EVSE DC and AC/DC · public manufacturer information, under review. Reference configuration: Easy Chester Ultimate with CCS 2 (DC) and AC (Type 2); safety tests, fault simulation and ISO 15118 as options.
58 entries: Yes: 20 · No: 4 (of which 2 not publicly documented) · Yes, as option: 25 · Open / unclear: 1 · Planned: 2 · Value: 6.
55 of 58 entries with an assigned manufacturer source (2 manufacturer sources (evidence classes A)); 3 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE AC · public manufacturer information, under review. Reference configuration: Easy Chester Micro (Type 1 or Type 2) with ISO 15118-2 (as standard) and the options safety tests and fault simulation.
37 entries: Yes: 14 · No: 3 (of which 1 not publicly documented) · Yes, as option: 13 · Open / unclear: 1 · Planned: 2 · Value: 4.
35 of 37 entries with an assigned manufacturer source (3 manufacturer sources (evidence classes A, B)); 2 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE DC and AC/DC · public manufacturer information, under review. Reference configuration: FEV500/CCS2 with TruTest license for the reports.
58 entries: Yes: 20 · No: 26 (of which 23 not publicly documented) · Partial: 5 · Value: 6 · Not stated: 1.
38 of 58 entries with an assigned manufacturer source (6 manufacturer sources (evidence classes B, C)); 3 with a candidate source (the manufacturer's robots.txt blocks automated retrieval); 17 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE AC · public manufacturer information, under review. Reference configuration: FEV350/KIT (Type 1/Type 2 adapter, 1664 FC) + TruTest license Lite or Advanced (separate; included in the PRO versions, which come without the 1664 FC).
37 entries: Yes: 14 · No: 16 (of which 15 not publicly documented) · Yes, as option: 1 · Open / unclear: 1 · Partial: 1 · Value: 4.
27 of 37 entries with an assigned manufacturer source (4 manufacturer sources (evidence classes B, C)); 10 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE DC and AC/DC · public manufacturer information, under review. Reference configuration: A 1732 DC EVSE Adapter + MI 3155 EurotestXD (CCS2, CHAdeMO, Type 2).
58 entries: Yes: 20 · No: 21 (of which 14 not publicly documented) · Yes, as option: 4 · Open / unclear: 2 · Partial: 4 · Value: 7.
48 of 58 entries with an assigned manufacturer source (8 manufacturer sources (evidence classes A)); 10 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE AC · public manufacturer information, under review. Reference configuration: A 1632 eMobility Analyser (standard set with Type 2 plug adapter, long CP pin) + installation tester MI 3155 EurotestXD; eMobility app free of charge.
37 entries: Yes: 11 · No: 14 (of which 13 not publicly documented) · Yes, as option: 4 · Partial: 3 · Value: 5.
28 of 37 entries with an assigned manufacturer source (6 manufacturer sources (evidence classes A, B)); 9 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
EVSE AC · public manufacturer information, under review. Reference configuration: PROFITEST PRIME AC (M516H) + H+E EXPERT CHECK (M525R); according to the datasheet (“PROFITEST MF / PROFITEST PRIME AC”) and the PRIME AC manual, the latter's accessory for AC charging points. For the caveat on vehicle simulation, see IEC 61851-1 control pilot signaling.
37 entries: Yes: 13 · No: 15 (of which 11 not publicly documented) · Yes, as option: 1 · Partial: 3 · Value: 5.
29 of 37 entries with an assigned manufacturer source (5 manufacturer sources (evidence classes A, B)); 8 without a source (not publicly documented).
Data as of: Nov 21, 2026 · public manufacturer sources · evaluation BEST-Matrix v0.109.
Frequently asked questions
Short answers; the device values are in the comparison table. Each answer links the rows it is based on. Device-related statements are based on public manufacturer information, as of November 21, 2026.
Three device configurations, alphabetically: comemso Easy Chester Ultimate (AC/DC), Fluke FEV500 CCS2 (DC) and Metrel A 1732 + MI 3155 (AC/DC). According to the manufacturers, all three test CCS2 charging stations, one of them depending on the configuration. The comparison does not claim to be complete; how a device is included is described in the methodology. You decide which device fits your test case – there is no ranking.
In the table: R01, R07, A01 · manufacturer information, as of Nov 21, 2026
It plugs into the charging cable like a vehicle and tests the charging process from the vehicle's point of view. Typical tests are connection setup via PLC (SLAC), charging communication according to DIN SPEC 70121 or ISO 15118, charging release with a small load, charging voltage and current, and protective functions – for example whether the station's insulation monitoring (IMD) trips and how quickly the voltage drops after switch-off. Depending on the device and equipment, measurements on the installation are added, such as insulation resistance and protective conductor.
In the table: R23, R17, R18, R42, UOFF, R33, R39 · manufacturer information, as of Nov 21, 2026
All three support DIN SPEC 70121 and ISO 15118 for DC, one of them ISO 15118 as an option. What differs is which parts of the standard (-2, -3) are publicly documented. ISO 15118-20 is not documented as available for any of the three (planned for one), and neither is TLS encryption.
In the table: R17, R18, P15118, P20, PTLS, P20TLS · manufacturer information, as of Nov 21, 2026
Insulation faults, yes – with all three devices, with one of them as an option. All three also simulate faults at the charging point such as a CP short circuit, to different extents: the Metrel device most comprehensively, the Ultimate as an option, the FEV500 only fault state E. The comparison does not cover charging aborts by the vehicle as a separate criterion.
In the table: R42, FSIM, UOFF · manufacturer information, as of Nov 21, 2026
All three devices test insulation resistance, protective conductor, insulation monitoring, residual voltage, voltage after switch-off (Uoff) and DC terminal voltage – some without, some with an option. Grid-side tests such as loop impedance and residual current device also concern DC charging stations, because they too are connected to the AC grid. The two AC/DC devices offer these tests, partly as an option; for the pure DC device they are not publicly documented.
In the table: R33, R39, R42, R34, GRIDZS, RCD, RDCDD, UOFF · manufacturer information, as of Nov 21, 2026
Yes, at low power. The device takes on the role of the vehicle, negotiates the charging session and draws approx. 1.5 to 2 kW via an internal load. How long a charging session can run depends on the device and equipment – from 20 seconds up to 4 hours with optional external loads; the maximum duration is not stated for every device.
In the table: R08a, R11, R14 · manufacturer information, as of Nov 21, 2026
The basic functions, yes; the full power, no. Communication, charging release, basic measured values and protective functions such as insulation monitoring and residual voltage can usually be tested with a small load, provided the station supports the tester's operating point. Power levels, cooling, overcurrent and temperature protection or the measurement accuracy at high current cannot be tested this way. The devices in the comparison work internally with approx. 1.5 to 2 kW, one optionally offers external loads up to 60 kW; none of them performs a full-load test with 150 to 400 kW. That requires a load system in the power class of the station.
In the table: R08a, R09, R10 · manufacturer information, as of Nov 21, 2026
The simulation checks whether the station charges correctly; the full-load test checks whether it delivers its rated power. In the simulation, the tester negotiates the charging session like a vehicle but only draws as much power as its load can handle. A full-load test loads the station with its rated power – long enough for cooling and power electronics to show their behavior in continuous operation. We do not compare load systems for this here.
General explanation, not manufacturer information
According to the manufacturers, only the comemso Easy Chester Ultimate simulates an 800 V vehicle (approx. 660 V). For the Fluke FEV500, the product specification states a load test up to 330 V (evidence not yet checked by us); the Metrel A 1732 + MI 3155 simulates 280–310 V. An 800 V-capable charging station can usually also be functionally tested at an operating point of around 300 V; only a device that simulates this battery voltage tests the 800 V operating point itself. A measuring range up to 1000 V does not mean that a device simulates an 800 V battery.
In the table: R05, R06, R15 · manufacturer information, as of Nov 21, 2026
The limits differ per device; what matters is what is simulated, what is loaded and what is measured. The simulated battery voltage determines the operating point, the load the power that actually flows, and the measuring range only what the device can record. In the comparison table, each of these rows is labeled accordingly; the table with the filter “Voltage, current & load” shows them together.
In the table: R05, R06, R08a, R09, R10, R11, R14, R15, R16, R35 · manufacturer information, as of Nov 21, 2026
A charging station tester checks function and safety; a power meter measures; a calibration system checks whether the station measures the billed energy correctly. The tester simulates a vehicle for this, the power meter does not. Testing the energy measurement requires a reference measurement; if the measurement is relevant for billing, in Germany it falls under metrology and calibration law. One test does not replace the other – see Scope.
General explanation, not manufacturer information
Yes, all three are intended for on-site testing. They differ in weight – approx. 16 to 26 kg – and in power supply: internal battery, external power bank or mains connection. Two offer a guided DC test procedure; for the Metrel A 1732 + MI 3155, according to the manufacturer, there are currently only individual tests for DC, the auto sequence applies to AC.
In the table: R48, R47, R22 · manufacturer information, as of Nov 21, 2026
We do not state or compare prices. Anything that according to the manufacturer is only available with additional equipment, a package or a license is shown in the table as “Yes, as option”; clarify with the manufacturer what an option includes. We record software and licenses as an option if the manufacturer explicitly names them as an add-on – how test reports are created and whether PC software or an app is needed is shown in the rows on reports.
In the table: R45, U07 · manufacturer information, as of Nov 21, 2026
Knowledge / battery pack test systems
Eight points you should clarify specifically before procuring a battery pack test system.
Editorial guide · as of Nov 20, 2026 · not a product comparison
Example calculation: 800 V × 200 A corresponds to 160 kW of instantaneous DC power. Whether an offered system supports this operating point continuously must be shown by the operating map. This calculation is not a product specification.
The checkmarks only show your working status. They do not confirm any product property and are discarded when the page is reloaded. The download is a fillable PDF: all points with checkboxes, pre-filled with your current status, and fields for project, contact person and answers. For this we ask once for your name for the “Created for” line.
01 / Check point
Check voltage, current and DC power together for charging and discharging. Individual maximum values do not fully describe the required operating point. An operating map with the permissible combinations is meaningful.
What continuous power is available simultaneously at the voltage and current we need, per channel and at full utilization?
Suitable evidence: operating map and conditions for the offered configuration.
02 / Check point
Record the base unit, hardware options, software and licenses separately. Additional software can be a separate option.
Which functions are included in the offer, and which require additional hardware, licenses or services?
Suitable evidence: offer configuration and version status mapped to the documented scope of functions.
03 / Check point
Ask for the complete accuracy definition for your measuring points. A resolution specification does not answer this procurement question. Also clarify where the specification applies: at the output of the test system or at the input of your device under test. In between are cables, connectors and possibly switchgear; their voltage drop increases with the current. Whether measurement is taken directly at the device under test, for example via sense lines, is therefore part of the accuracy specification.
What accuracy applies to voltage and current in our ranges, at what temperature and under what calibration conditions – and does it apply at the input of our device under test or at the output of the test system?
Suitable evidence: specification with measuring range, conditions, calibration scope and measuring point (output terminal of the test system or connection of the device under test, e.g. via sense lines).
04 / Check point
Record independent channels, shared limits and approved parallel operation separately.
Which combination of independent and parallel channels is approved, and which limits apply in simultaneous operation?
Suitable evidence: channel architecture and approved configuration.
05 / Check point
Ask about control response, measured value acquisition and stored data separately.
How fast does the control respond, which values are recorded and which data rate is stored permanently with a time reference?
Suitable evidence: separate specifications with conditions and software version.
06 / Check point
A connector does not yet tell you which control and data transfer are available in your test sequence.
Which commands, data formats and integrations are documented, and which software or licenses do we need for the climate chamber and test bench control?
Suitable evidence: interface documentation and offered integration.
07 / Check point
Document boundary conditions for the actual application. Permissible current values can, for example, depend on the voltage and on the module used.
Which limits apply to temperature, continuous operation, load changes and the required voltage/current combinations?
Suitable evidence: operating limits and application notes for the exact model.
08 / Check point
Assign each required value to a model, a configuration and a location. An open entry remains a query.
Please assign each answer to a current source with document title, revision, page or section and configuration.
Suitable evidence: characteristic-related list of sources; explicitly mark open contradictions.
Compare suitable systems, collect queries at the respective characteristic and define your mandatory and desired criteria in the RFQ. Questions for manufacturers go through the portal for manual forwarding.
This article is an editorial guide based on our practical experience, not a study: we have not systematically surveyed how often which information is missing from datasheets. We do not assess individual products in it.
The procurement questions are editorial conclusions from our practical experience. Technical approval before publication is still planned.
From preselection to request for quotation
Describe your project, define mandatory and desired criteria and create a request for quotation for the manufacturer of your choice.
RFQ stands for “Request for Quotation”, i.e. a structured request for a quote. You decide who receives it and send the file yourself. The comparison is only included if you explicitly adopt it. Abbreviations such as RCD, CP or SoC are explained in the glossary.
Contact & editorial team
What would you like to clarify? Queries from a comparison already bring along the entries and your evidence. You report a new system or a correction using the form further below. For everything else, write to us using the contact form in the legal notice.
1 Choose questions · 2 Review request · 3 Send by e-mail
Your request goes to the editorial team of BestEVTestSystems.com. If it is meant for a manufacturer, we forward it manually. The editorial team belongs to WAIS Solutions GmbH; its managing director is also an employee of comemso (details in the legal notice). A request is only received by the manufacturer to whom it is addressed; you can also contact any manufacturer directly.
Our entries and your correction proposals remain visible separately. Evidence links are attached to the respective question. Evidence you submit is initially unverified.
Suppliers & expert users
For new systems, substantiated corrections and complaints – in one form that makes it easier for us to review.
For inclusion the following applies: We show three to five systems per comparison. A system is included if it meets the admission rules of the class and reaches the minimum score of the evaluation matrix; if five systems are already in the comparison, the score decides. For admission rules and criteria, please name publicly accessible documents (without request and without login) – a well-known brand name is not sufficient. What we evaluate is described under Notes for manufacturers. We do not include systems that essentially replicate another product; anyone who takes a model as a reference must show a substantial technical contribution of their own. Rules for inclusion.
When you submit, your e-mail program opens with a prepared message to info@bestevtestsystems.com; you send it yourself. Until then the draft stays on your device and can be discarded at any time.
Knowledge
What RFQ, RCD, CP, SoC and other abbreviations from comparisons, datasheets and requests for quotation mean – briefly explained.
85 terms.
The explanations are deliberately short and simplified. The applicable standards and the manufacturers' documents are authoritative; standards are revised. As of November 21, 2026.
No term matches your search. Is one missing? Write to us using the contact form.
Is a term missing or an explanation inaccurate? We welcome notes via the contact form.
Transparency & methodology
We compile manufacturer information, assign it to the model and configuration and record what is supported by evidence and what is not. Only you can decide whether a system fits your project – we make sure you can trace the information you need for that.
A comparison includes three to five test systems, no more. Five is the upper limit so that the table remains clear and each system gets the attention it deserves. Our aim is to show a selection of the best systems in each category – not a complete market overview. We do not want to dilute this selection.
Whether a system enters the comparison is decided by the evaluation matrix – equally for all manufacturers: it must meet the admission rules of the class and reach the minimum score and the minimum evidence quality. If a system meets these rules and there is room in the comparison, we include it. If five systems have already been included, a new system replaces the one with the lowest score if it achieves more points. A well-known brand name does not count, only what is supported by evidence. What we need for the review: supplier, specific model, test object, offered configuration, sources and at least one technical piece of evidence that can be clearly assigned to the model. The EVSE comparisons evaluate public manufacturer information according to BEST-Matrix v0.109 (as of November 21, 2026); there is no scoring with a minimum score there yet. Since November 8, 2026, minimum requirements for inclusion apply to the AC view: vehicle simulation at Type 2 charging points according to IEC 61851-1, measuring the CP signal (voltage and duty cycle), verification of protective measures (insulation, protective conductor, loop impedance, RCD) and publicly accessible technical data. Per manufacturer we include the strongest AC configuration, at most five.
A “Yes” or “No” initially only states what the manufacturer declares. Separately, we show whether there is evidence for it and whether we have checked it. This review is a document review – we do not re-measure and do not certify anything. A datasheet, manual or test report only counts for us if it is clear which model, which configuration, which revision and which page it belongs to. We do not count comparisons by manufacturers or dealers – including those about competing products – or information without a document as evidence, but only as a reason to check the public documents of the respective manufacturer. This applies equally to all manufacturers.
What you really need and within which operating limits a device works weighs more than the number of functions. “Yes, as option” means: available as an option or with additional equipment according to the manufacturer. This says nothing about whether the device ends up more expensive than the others in the comparison – often it only means that the manufacturer allows more freedom in choosing variants and you only pay for what you need. We show the option separately from “Yes”; in the combined highlighting it also counts once. What it includes exactly and what it means for your configuration is best clarified directly with the manufacturer. We do not state or compare prices. A system with fewer Yes entries can be the better choice for a special test case. In your own RFQ you specify what is mandatory and what is desired.
A system being in the comparison means: it meets the admission rules of the evaluation matrix and is thus – measured by its criteria – among the best in its category. Within the comparison, however, we do not establish a ranking and do not award a top status: a ratio such as “25–30 % Yes” is not suitable as a measure of quality, and which system comes out ahead depends on your test case. Should there be an award later, then only with criteria published in advance, related to a specific category and configuration, with sufficient evidence and a traceable justification. The “Best” in the portal name stands for this selection claim, not for a seal on the individual product.
Manufacturers can submit information and evidence but cannot decide on the review status. We record in writing why we include or reject a system or change a disputed entry. If someone on the editorial team has a personal or economic interest in an entry, an uninvolved expert should cross-check the decision. If that is not possible, we do not claim an independent review either.
The portal is created in spare time and is neither externally financed nor monetized: no manufacturer pays for the portal, and there are no paid content or placements. Should this change, the following applies: neither payments nor paid requests may improve inclusion, evidence status or editorial assessment, and we label paid content recognizably and separately from the comparison results. We disclose the operator's link to comemso under 07.
The portal is operated by WAIS Solutions GmbH. Its managing director, Manuel Athanasas, is also an employee of comemso electronics GmbH and related to its founder and managing director. In addition, WAIS Solutions GmbH works as a service provider for comemso, including coaching on employee development, communication for managers and stress management; Manuel Athanasas is a certified coach. Devices from comemso appear in individual comparisons, currently in the EVSE installation testers. These comparisons are comparative advertising within the meaning of Section 6 of the German Act Against Unfair Competition (UWG) and are labeled as such at the beginning of the respective comparison and in its downloads; pages without comemso devices carry no notice.
What follows from this for us:
Financing: the portal is created in spare time, without external financing and without income (rule 06). The labeling as comparative advertising nevertheless remains, because the operator's managing director works at comemso and is related to its founder, and the operator works for comemso.
Missing evidence and a missing function are two different things – and you can see both in the table.
The manufacturer's declaration for the stated configuration. A “No” must be supported just like a “Yes”. The color of the symbol says nothing about whether evidence is available.
The information is missing, contradictory or cannot be clearly assigned. We do not automatically count this as “No”. Why the review is open should be recognizable at the characteristic.
“Not documented” counts as “No” – in all comparisons, equally for all manufacturers. If a manufacturer does not document a function anywhere, we count it as not available. Anyone who wants to sell something advertises the important functions of their device; if the documentation is silent about it, it is very unlikely that the function exists. The original wording (“Not documented”) remains visible at the field, and a correction note with evidence can change the rating at any time.
The basis is exclusively public manufacturer documents: freely accessible, without request and without login. We do not contact manufacturers individually – each manufacturer is itself responsible for the information it provides publicly. We evaluate all manufacturers in a comparison on the same cut-off date and at the same locations. The field and every download show “Not publicly documented · as of … · counts as No”, so that nobody mistakes such a No for an explicit manufacturer statement. We accept corrections with a public source at any time: we usually correct obvious errors within five working days (quick correction), everything else at the latest with the next update (Notes for manufacturers).
Only with a published justification relating to the category or design – not as a way out for missing evidence. The justification is shown directly at the characteristic. For a later ratio, we remove criteria that are not applicable from the denominator and show them separately. This applies equally in all comparisons, including the battery comparisons.
We do not judge whether a replica is legally permissible – courts decide that. We decide whether a system belongs in a selection of the best in its category. A system that essentially replicates another does not belong there – even if it comes to market with its own developers, its own documentation and its own declaration of conformity. After all, a replica by reverse engineering also needs all of that, just with considerably less work of its own. Anyone who takes a model as a reference must therefore show a substantial contribution of their own.
We do not include a system without further review if one of these points is substantiated:
If there is a substantiated indication, we compare the system with the named model. What a standard prescribes or what is technically mandatory does not count. What matters is what a manufacturer can design freely:
If freely designable features from at least two of these areas largely match, we treat the system as a presumed replica. Identical errors or peculiarities are sufficient on their own – they hardly arise independently of each other.
In the case of a presumed replica, it is up to the supplier to convince us. There are two ways to do so:
Small improvements are not enough: slightly better accuracy, a different report design or a single small additional feature are just as insufficient as a lower price, a different enclosure, a different color or a new logo. Whether a contribution is substantial is decided by an external expert, who justifies it in writing. The rule applies equally to all manufacturers. If neither of the two ways succeeds, we do not include the system.
Procedure and limits. Similar functions alone are no indication of a replica: many test steps are prescribed by standards such as IEC 61851 or DIN VDE 0100-600, and proven solutions become established in the market. We therefore only review in response to a substantiated indication with evidence – for example photos, screenshots, document comparisons or a teardown report. A competitor's complaint alone is not sufficient. The supplier is given the opportunity to comment. The decision is made by an external expert with no connection to the operator or to the manufacturers involved. We record the decision and its justification in writing.
Identical devices sold under a different name with the manufacturer's consent (OEM, license, private label) are not replicas; we list them once and name the identical designations. For such a system, the public listing only says “not included” – without any addition suggesting a replica. We only speak of plagiarism if a court has found so.
The same for all manufacturers: which documents we evaluate, what we evaluate and how information can be evaluated well. Beyond that, we do not give individual hints to any manufacturer. How we handle product images is described under Product images; how you provide images, under D / Images.
We evaluate what is freely accessible – without request and without login:
We do not count documents available on request or behind a login, information by e-mail or phone, or comparisons by manufacturers or dealers.
Only information on available products and released functions counts. Anything labeled as planned, announced, “coming soon” or preview does not count. If documents contradict each other, the more conservative value applies until the contradiction is resolved publicly.
The cut-off date is the 1st of each month, the same for all manufacturers; it is shown on every comparison. We usually publish the evaluation within four weeks. We announce changes to criteria or admission rules on this page at least one cut-off date in advance.
Anything that cannot be found this way is shown in the table as “Not publicly documented · counts as No”. Any entry can be corrected with a public source.
You do not send us images – you release them publicly. Then the same applies to your image as to any other:
The image appears at the earliest at the next cut-off date after we have checked and saved the terms of use, and with rights holder, location and terms of use at the image. You can send a link to the public image page using the contact form; we do not accept image files by e-mail or individual approvals.
Example wording for terms of use (non-binding, not legal advice): “Third parties may use the images in this area for reports, product comparisons and comparison portals – also reduced in size and in a different file format, otherwise unchanged, with the credit ‘Photo: [manufacturer]’.”
Saved automatically, checked manually according to fixed rules – the same for all manufacturers.
On the 1st of each month, a program retrieves all stored public locations – including those of the reviewed systems that were not included – and saves them as an archive: copy of the document, screenshot of the page, address, retrieval time and checksum. It respects the manufacturers' robots.txt and machine-readable usage reservations. This way every entry can be traced back to the status on the cut-off date. On product pages it also collects image candidates for internal review (Product images).
We show the review status of each entry under “Trace entries and sources”.
We usually publish the evaluation for the cut-off date within four weeks; every update receives an entry in the change log. We also correct obvious errors between cut-off dates (quick correction). The portal is created in spare time. If an update is delayed, this is noted at the affected comparison, and the last published status continues to apply.
Shown only with the rights holder's public permission, otherwise a link to the photo at the manufacturer – the same for everyone and without influence on the rating.
Product photos are protected by copyright. The fact that an image is freely available online does not mean it may be shown here. We only show an image if the rights holder publicly permits its use:
As with the data, we do not make individual requests and do not accept individual approvals. Permission only for editorial reporting is not sufficient, because individual comparisons are labeled as comparative advertising. How manufacturers provide images is described under Notes for manufacturers, D / Images.
An image has no influence on admission, order or rating, and it does not support any technical entry.
On the cut-off date, the program collects image candidates from the product pages – for internal review only. An image only appears once we have manually checked the terms of use and saved them on the cut-off date, and only as long as it is publicly available on the cut-off date.
If the terms of use change, we check again before the next update; without a renewed check, the placeholder replaces the image. If the rights holder objects, we remove the image immediately (Contact). The images are on our server; when you visit the page, your browser does not load anything from manufacturer servers.
We check image links on the cut-off date: they must open an image file of the manufacturer directly without login. Only when you click such a link does your browser load from the manufacturer's server. If a photo is not retrievable on the cut-off date or a link no longer works, the placeholder shows “Photo not retrievable on the cut-off date” until the next check – the same for all manufacturers.
A counter-statement we receive does not automatically replace the published entry. It goes through the same process as any other entry.
We correct obvious errors quickly – the same for all manufacturers. If an entry deviates from the document on which it is based – for example an incorrectly transferred value, a wrong unit or a mix-up of model or configuration – we usually correct it within five working days of receiving the note, not only at the next cut-off date. This also applies to a public document that already existed on the cut-off date and that we overlooked. Each such correction receives an entry in the change log.
New or changed manufacturer documents that appear after the cut-off date, on the other hand, only count from the next cut-off date, so that the same status applies to all manufacturers. Anything that requires weighing up – contradictions between documents, interpretation, assignment of options – we review for the next update.
Please report an error to us first (report a correction) – that is the fastest way to fix it.
Retention and withdrawal of corrections: requests and submissions via “Clarify entries. Submit evidence.” are the basis of our corrections. We therefore keep them for 36 months (privacy policy). Before the period expires, we review every change based on them again: if it can still be supported publicly with the usual means – manufacturer pages, datasheets and manuals without request and without login, search by model and characteristic – it remains with this source. Otherwise we discard the correction and re-evaluate the entry based on the publicly accessible information – with version status, review date and reason for the change.
You can find the public change log at the end of this page (change log); we are still setting up permanent case management. Deadlines: obvious errors usually within five working days, all other substantiated corrections at the latest with the next update.
Notification of changes – the same for all manufacturers. Those who sign up receive a summary notification after each monthly update, not a separate message about individual product launches. Only what has demonstrably changed in the comparisons is included: new or changed entries with a source, newly included systems or systems no longer included, corrections. Announcements and planned functions do not trigger a notification. Each change is shown in the same format – model, criterion, previous entry, new entry, source – without promotional assessment. The notification is an excerpt from the public change log. If it concerns comemso devices, it carries the same note on comparative advertising as the comparisons.
Your request first reaches our editorial team. Which manufacturers you want to reach is stated in the message text together with the assigned questions; we forward them manually. We only pass on contact details and evidence to the extent you have agreed to. A request or a manufacturer's answer does not in itself change any rating.
Prepare questions and evidence →We treat publicly accessible locations and confidential documents differently. The fact that we review a document internally does not allow us to publish it or pass it on to manufacturers. We clarify usage rights and the scope of disclosure in advance. The technical file scan and the expert review of the content are two separate steps.
View privacy information →These points are open. There is currently no independence review or certification, and we do not claim any.
Each update receives an entry here with version, cut-off date and changes. Details are given at each entry (origin and review date) and under “Trace entries and sources”.
Rules as of · Nov 21, 2026
Provider information
Convenience translation. Only the German version of this page is legally binding.
Managing director:
Manuel Athanasas
E-mail:
info@bestevtestsystems.com
Privacy:
info@bestevtestsystems.com · Privacy policy
Conflict of interest and comparative advertising: The managing director of WAIS Solutions GmbH, Manuel Athanasas, is also an employee of comemso electronics GmbH and related to its founder and managing director. WAIS Solutions GmbH is also a service provider to comemso electronics GmbH, among other things in coaching. Comparisons on this portal that include comemso devices are therefore comparative advertising within the meaning of Section 6 of the German Act Against Unfair Competition (UWG). The rules we follow for this are set out in rule 07 of the methodology.
Image credits: The rights to product images belong to the respective rights holder; rights holder, location and terms of use are shown directly at the image (rules for product images). Block diagrams on the comparison pages: our own schematic illustrations.
Write to us directly using this form. Your message goes to info@bestevtestsystems.com, and we reply to the e-mail address you provide. We do not send an automatic confirmation of receipt by e-mail; after submitting, you will see a reference number here.
Privacy
Convenience translation. Only the German version of this page is legally binding.
What data we process when you use BestEVTestSystems.com, for what purpose, on what legal basis and for how long – and what rights you have.
WAIS Solutions GmbH
Karlsbader Straße 13
73760 Ostfildern
Germany
Managing director: Manuel Athanasas
E-mail: info@bestevtestsystems.com
Contact person for data protection: Manuel Athanasas, managing director
E-mail for data protection requests: info@bestevtestsystems.com
The managing director of WAIS Solutions GmbH is also an employee of comemso electronics GmbH, which offers devices in individual comparisons (legal notice). We do not pass on your data to comemso electronics GmbH or to other manufacturers – unless you explicitly address a request to a manufacturer (section 7).
| What | Purpose | Legal basis | Storage period |
|---|---|---|---|
| Server log files at IONOS | Delivery of the website, stability, security | Art. 6(1)(f) GDPR | at most 8 weeks (according to IONOS, section 3) |
| Entries in your device's browser storage | Functions you use (drafts, questions, name for “Created for”, view) | Section 25(2) No. 2 TDDDG; Art. 6(1)(f) GDPR | until you delete them |
| Report of each download (name, company, role, e-mail address – if provided –, file, page, time) | Tracing for whom a file with your name was created; queries about the download; overview of usage | Art. 6(1)(f) GDPR | 12 months |
| Notification of changes (e-mail, name, company, role) | Summary notification, at most once a month | Consent, Art. 6(1)(a) GDPR | until you unsubscribe; unconfirmed 30 days; proof thereafter for up to 3 years |
| Requests and submissions to the editorial team (by e-mail that you send yourself) | Processing and answering, editorial review, proof of the basis of corrections | Art. 6(1)(a) and (f) GDPR | 36 months after receipt |
| Request to a manufacturer | Forwarding to the manufacturer you name | Consent, Art. 6(1)(a) GDPR | as for requests |
| Message via the contact form (name, e-mail address, message; optionally company and subject) | Answering your message | Art. 6(1)(b) or (f) GDPR | until your matter has been dealt with (section 8) |
| Counters against abuse (pseudonymized IP identifier) | Protection against spam and overload | Art. 6(1)(f) GDPR | 48 hours |
We do not use analytics, tracking or advertising services. We deliver fonts, scripts and images from our own server; when you visit the pages, no content is loaded from third-party servers. Only when you follow a link to a manufacturer page do the privacy notices of the respective provider apply there.
The website is hosted by IONOS SE, Elgendorfer Str. 57, 56410 Montabaur, Germany. IONOS processes the data on our behalf (Art. 28 GDPR). The storage of the download reports also runs via IONOS (section 5).
With every visit, the server processes technically necessary data: the IP address of your device, date and time, the requested address, the status code and the amount of data transferred. This is necessary to deliver the website and to ensure its operation and security; this is our legitimate interest (Art. 6(1)(f) GDPR). According to IONOS, these log files are kept for at most 8 weeks; the IP addresses in them are anonymized.
The connection to the website is encrypted (HTTPS).
The website does not set cookies. So that functions you use keep working after a reload, it stores entries in your browser's storage (localStorage). These entries remain on your device; they are only transmitted to us as described in sections 5 to 7.
The legal basis for storing and reading is Section 25(2) No. 2 TDDDG, for further processing Art. 6(1)(f) GDPR. You can also remove all entries by deleting the website data in your browser. Only the password-protected administration area for the operator uses a technically necessary session cookie; website visitors cannot access this area.
Your browser generates comparisons, RFQ documents and the checklist. Each file carries the portal logo, the creation date and your name in the “Created for” line. That is why we ask for your name before the first download; company, role and e-mail address are voluntary. A download is not possible without a name.
With every download the website transmits to our server: name, company, role and e-mail address (if provided), file name, page, portal version and time. We store this report and also receive it by e-mail in our editorial mailbox.
Purpose: we want to be able to trace for whom a file with the portal logo and name was created – comparisons and the checklist are intended for your own use and may not be redistributed without the portal logo –, to be able to reach you with queries about your download if you provide an e-mail address, and to see which comparisons are used in order to develop the portal further. This is our legitimate interest (Art. 6(1)(f) GDPR). We do not send advertising to this address; you only receive notifications with your consent (section 6). We do not pass the information on to manufacturers.
Storage period: 12 months from the download. After that, the server deletes the report automatically; we delete the e-mail in the mailbox within the same period. You can object to the processing at any time (section 11), most easily by e-mail to info@bestevtestsystems.com; we will then delete your download reports.
When downloading, you can voluntarily tick that we may notify you by e-mail when entries in the comparisons change – as a summary notification, at most once a month. For this we process your e-mail address, your name, your company and your role (if provided), the wording of your consent, the file and page of the sign-up, and the times of sign-up, confirmation and unsubscription.
With the checkmark, the website prepares an e-mail to info@bestevtestsystems.com after the download – with your details, the file and page of the sign-up and the wording of your consent. Your e-mail program opens, and you send the e-mail yourself; we receive nothing before that. We reply to your e-mail with a request for confirmation (double opt-in). Only once you confirm will you receive notifications. We use your details only for this notification – not for other offers of WAIS Solutions GmbH – and do not pass them on to manufacturers or other third parties. We send the notifications via our own e-mail account, not via a newsletter service.
The legal basis is your consent (Art. 6(1)(a) GDPR). You can withdraw it at any time with effect for the future – via the unsubscribe link in every e-mail or by sending us a message. We delete unconfirmed sign-ups after 30 days. After an unsubscription, we immediately delete name, company and role; we keep the e-mail address, times and wording of the consent for up to three years in order to be able to prove that consent was given (Art. 7(1) GDPR), and delete them afterwards (Art. 6(1)(f) GDPR).
Via the contact page you can have questions from a comparison clarified or submit a system for inclusion, a correction or a complaint. For this we process your name and your e-mail address for the reply, voluntarily your organization, phone number and a message, as well as the content of the request: questions with comparison context, manufacturer information, correction proposals, locations and evidence links. We only accept evidence as links, not as files.
The website does not transmit your entries itself. When you submit, your browser generates an e-mail to info@bestevtestsystems.com from them and opens your e-mail program; in addition, the page shows the text for copying, for example for a webmail mailbox. Only when you send this e-mail do we receive your details – via your e-mail provider into our mailbox. Until then they remain only in your browser (section 4). We use the details to process and answer your request and to document our editorial decision in a traceable way. Legal bases: your consent (Art. 6(1)(a) GDPR) and our legitimate interest in reviewing and documenting the comparison entries (Art. 6(1)(f) GDPR).
If you address a request to a manufacturer, we only forward your questions, evidence links and contact details with your explicit confirmation to the recipient of this manufacturer that you name; other manufacturers do not receive them. The manufacturer is then responsible for further processing.
Storage period: 36 months from receipt; after that we delete the e-mail from our mailbox. The longer period has a reason: requests and submissions can be the basis of a correction in the comparisons. As long as such a change applies, we must be able to prove what it is based on – also towards manufacturers whose information we compare, and to defend against claims (legitimate interest, Art. 6(1)(f) GDPR). Before the period expires, we check whether the change is supported by publicly accessible sources; if it is not, we withdraw it and re-evaluate the entry based on public information (methodology). We only keep a request longer if there is a legal obligation, for example if it becomes business correspondence that we must retain under Section 257 of the German Commercial Code (HGB) (Art. 6(1)(c) GDPR). A request does not involve signing up for notifications.
In the legal notice you can write to us using a contact form. For this we process your name, your e-mail address and your message, voluntarily also your company and a subject. When you submit, your browser transmits this information in encrypted form to our server at IONOS. The server forwards it as an e-mail to info@bestevtestsystems.com, with your address as the reply address. We do not store the message on the web server; afterwards it is only kept as an e-mail in our mailbox. We do not send you a confirmation of receipt.
If direct sending is not possible, the page instead prepares an e-mail to info@bestevtestsystems.com that you send yourself; we receive nothing before that (as described in section 7).
The purpose is to answer your message. The legal basis is Art. 6(1)(b) GDPR if your message relates to a contract or pre-contractual measures, otherwise our legitimate interest in answering inquiries (Art. 6(1)(f) GDPR). To prevent abuse, the server counts the submissions per pseudonymous identifier (section 9).
Storage period: we delete the e-mail once your matter has been dealt with. If it becomes a request or submission concerning the comparisons, the period from section 7 applies; if it becomes business correspondence, we keep it according to the statutory periods (Section 257 HGB; Art. 6(1)(c) GDPR).
To prevent automated abuse of download reports and the contact form, our server counts requests per sender for a short time. For this purpose it creates a pseudonymous identifier from your IP address using a secret key; we do not store the IP address itself for this. We delete the counters after 48 hours. The legal basis is our legitimate interest in secure operation (Art. 6(1)(f) GDPR). Stored download reports are encrypted on the server and can only be viewed via the operator's password-protected access.
Recipients of your data are IONOS SE as processor (hosting, storage of the download reports, sending of messages from the contact form, mailboxes under bestevtestsystems.com, including info@bestevtestsystems.com) and, in the case of a manufacturer request, the manufacturer you name. E-mails you send us also pass through your own e-mail provider. No transfer to countries outside the EU or the EEA is intended. Authorities only receive data if we are legally obliged to provide it.
You have the right of access (Art. 15 GDPR), rectification (Art. 16 GDPR), erasure (Art. 17 GDPR), restriction of processing (Art. 18 GDPR) and data portability (Art. 20 GDPR). You can withdraw consent at any time with effect for the future (Art. 7(3) GDPR); processing carried out until then remains lawful.
Right to object (Art. 21 GDPR): Insofar as we process data on the basis of our legitimate interest (Art. 6(1)(f) GDPR), you can object at any time on grounds relating to your particular situation. We will then no longer process the data unless we can demonstrate compelling legitimate grounds that override your interests, or the processing serves the establishment, exercise or defense of legal claims.
You can lodge a complaint with a data protection supervisory authority (Art. 77 GDPR), for example with the authority responsible for us: Der Landesbeauftragte für den Datenschutz und die Informationsfreiheit Baden-Württemberg (State Commissioner for Data Protection and Freedom of Information Baden-Württemberg), Lautenschlagerstraße 20, 70173 Stuttgart, Germany, www.baden-wuerttemberg.datenschutz.de.
You are not legally or contractually obliged to provide us with data. However, without a name you cannot download a file, without an e-mail address you cannot receive notifications, and without a name and e-mail address you cannot send a request or a message via the contact form. The e-mail address is not required for a download. There is no automated decision-making, including profiling (Art. 22 GDPR).
If the functions of the website or the service providers used change, we will adapt this privacy policy. The version published here applies.
As of: Nov 21, 2026 · website version 0.109